Donlin Gold Project, draft environmental impact statement.


Author:   US Army Corps of Engineers.

Publication:   JBER, AK : CEPOA-RD, [2015]

November 2015.

Physical description of original:   11 volumes : color illustrations, color maps, plans ; 28 cm. + 1 DVD (color ; 4 3/4 in.)



Notes:

Section 508 Compliancy
As stated on the Donlin Gold Project Draft EIS documents website, this document is not fully Section 508 compliant.   See that EIS webpage for more information.

Yupik Language Podcast:   Introduction to the Draft Environmental Impact Statement
Audio podcasts in Yupik are available on the Donlin Gold Project Draft EIS documents website.   These sound recordings discuss the Introduction and Chapters 1 through 5 of the Draft EIS.

Related documents
A list of related documents follows the Draft EIS below.



LINKS VIA ARLIS DOCUMENT SERVER



Physical VolumeContentsSize
(ES pages)Executive summary9.3 MB
Volume 1Table of contents -- Acronyms and abbreviations632 KB
Chapter 1.   Purpose and Need2 MB
Chapter 2.   Alternatives49 MB
Volume 2Chapter 3.   Environmental analysis (Sections 3.0 to 3.5)59.3 KB
Volume 3Chapter 3.   Environmental analysis (Physical) (Sections 3.6 to 3.9)98.5 MB
Volume 4Chapter 3.   Environmental analysis (Biological) (Sections 3.10 to 3.14)88.4 MB
Volume 5Chapter 3.   Environmental analysis (Social) (Sections 3.15 to 3.23)103 MB
High resolution visual simulation images of key observation points are available for Figures 3.17-18 to 3.17-25.   These figures also appear in Volume 5 as pages 3.17-41 to 3.17.49 (note that those pages lack page numbering), but some of those figures appear somewhat different from the high resolution versions linked here.

These figures are similations of the proposed rights-of-way at these locations.

40.6 MB
5.5 MB
3.3 MB
3.7 MB
40 MB
4.9 MB
4.7 MB
24.3 MB
44 MB
Volume 6Chapter 3.   Environmental analysis (Other impacts) (Sections 3.24 to 3.27)8 MB
Chapter 4.   Cumulative effects2.4 MB
Chapter 5.   Impact avoidance, minimization, and mitigation326 KB
Chapter 6.   Consultation and coordination3.2 MB
Chapter 7.   List of preparers142 KB
Chapter 8.   Distribution131 KB
Chapter 9.   References577 KB
Glossary of terms222 KB
Volume 7 Appendix A through Appendix B
  • Appendix A.   Financial assurance
  • Appendix B.   Scoping report & Public involvement plan
    • Donlin Gold Project, environmental impact statement, final scoping report / submitted to: US Army Corps of Engineers, Alaska District ; prepared by URS Alaska, LLC.

      Contents of Final scoping report:   Introduction -- Scoping methods -- Next steps in the EIS process -- Summary of comments received -- Contacts -- Appendices A-F.

      Note that appendices E and F were not published in print (there are "placeholder" pages for those sections), and are available only in digital format.   They appear on the Donlin Gold Project EIS background documents webpage as .zip files (190.8 MB and 15.7 MB in size).   They do not appear on the DVD version.   ARLIS has made these appendices available as .pdf files:
      Appendix E.   Public scoping comments
      Appendix F.   Cooperating agency scoping comments

    • Donlin Gold Project, environmental impact statement, supplemental public involvement plan / submitted to: US Army Corps of Engineers, Alaska District ; prepared by URS Alaska, LLC.
18 MB
Volume 8Appendix C through Appendix L
  • Appendix C.   Alternatives development process
  • Appendix D.   Pipeline engineering strip maps
  • Appendix E.   PHMSA enclosure B
  • Appendix F-1.   Planned mitigation programs for soil erosion
  • Appendix F-2.   Pipeline soils and permafrost data
  • Appendix G.   Stream crossings data tables
  • Appendix H.   Analysis of mine site geochemistry
  • Appendix I.   Air quality
  • Appendix J.   USACE Section 10 Rivers and Harbors Act/Section 404 Clean Water Act permit application
  • Appendix K.   Wetlands additional tables
  • Appendix L.   Wetlands pipeline strip maps
138 MB
Volume 9Appendix M through Appendix O
  • Appendix M.   Conceptual compensatory mitigation plan, Donlin Gold Project / prepared by: Michael Baker International. Revision 5.1.
  • Appendix N.   ANILCA [Section] 810 preliminary analysis of subsistence impacts
  • Appendix O.   Biological assessments.
    • Draft National Marine Fisheries Service biological assessment, Section 7 / prepared for: Donlin Gold, LLC ; prepared by Owl Ridge Natural Resource Consultants, Inc. -- Revision v1.2
    • Draft U.S. Fish & Wildlife Service biological assessment, Section 7 / prepared for: Donlin Gold, LLC ; prepared by Owl Ridge Natural Resource Consultants, Inc. -- Revision v1.2.
65.4 MB
Volume 10Appendix P through Appendix T
  • Appendix P.   Corps initiation of the government-to-government relationship with federally recognized tribes
  • Appendix Q.   Essential fish habitat assessment, Donlin Gold Project / prepared for: Donlin Gold LLC ; prepared by Owl Ridge Natural Resource Consultants, Inc. -- Draft version 2.1
  • Appendix R.   Oil discharge prevention and contingency plans
    • Terminal and tank farm oil discharge prevention and contingency plan, Donlin Gold Project / prepared by SLR International Corp.
    • Vessel operations oil discharge prevention and contingency plan, Donlin Gold Project / prepared by SLR International Corp.
  • Appendix S.   Pit lake ecological risk assessment.
    • [Memorandum to Nick Enos from Penny Hunter, August 31, 2015]
    • Donlin Creek Mine Project, pit lake ERA / prepared by ARCADIS U.S., Inc. (Cover sheet title: Donlin Gold Project, ecological risk assessment for the proposed Donlin pit lake.)
  • Appendix T.   Visual pipeline engineering strip maps
43 MB


Related Documents

Background documents   --   Donlin Gold website.   Includes:

Permit Application
The Draft Section 10/404 Permit Application (dated October 5, 2015) is called:   Update to Preliminary application for Department of the Army permit--Donlin GoldProject (POA-1995-120).   It is available as an ARLIS Internet resource as well as from the Donlin Gold Project EIS documents website (see link above).

Donlin Gold Project, final environmental impact statement.   April 2018

Donlin Gold Project, Joint Record of Decision and Permit Evaluation, U.S. Army Corps of Engineers, Bureau of Land Management, Crooked Creek, AK.   August 13, 2018.