Donlin Gold Project, environmental impact statement, final scoping report.
Submitted to: US Army Corps of Engineers, Alaska District ; prepared by URS Alaska, LLC.
Publisher: JBER, AK : CEPOA-RD, [2013]
Appendix F, Cooperating agency scoping comments.
The Final scoping report is part of Appendix B to:
Donlin Gold Project, draft environmental impact statement / US Army Corps of Engineers.
Publisher: JBER, AK : CEPOA-RD, [2015]
Appendices E and F of the Final scoping report were not published in print. (There are "placeholder" pages for those appendices in Volume 7, which is the volume containing Appendices A and B of the full Draft EIS). These two appendices are available only in digital format, and appear on the Donlin Gold Project EIS background documents webpage as .zip files (190.8 MB and 15.7 MB in size). They do not appear on the DVD version.
ARLIS has made these appendices available as .pdf files on its website. The complete text of volume 7 (minus these two appendices) is available on ARLIS's Draft environmental impact statement webpage. Due to the number of component documents, Appendices E and F are available on separate webpages. Appendix F appears on this page, while Appendix E is on another page.
* These two documents concerning Evelyn Thomas are also part of Appendix E, and were duplicated inside Appendix F during the publication of the Final Scoping Report of the Draft EIS.