Susitna Hydroelectric Project feasibility report / prepared by Acres.
Final draft.
[Anchorage, Alaska] : Alaska Power Authority, [1982]
7 v. in 9 : ill., maps ; 28-28 x 44 cm.
LINKS VIA ARLIS DOCUMENT SERVER
Documents related to this final draft report are listed below this table.
APA Number | SUS Number | Volume | Content |
174 or 1414 |
38 | Volume 1, Section 1-8 | Engineering and economic aspects |
175 or 169 or 1415 |
Volume 1, Section 9-19 | Engineering and economic aspects | |
176 or 1416 |
Volume 2, Section 1-4 | Environmental report | |
177 or 1417 |
Volume 2, Section 5-11 | Environmental report | |
178 or 1418 |
Volume 3 | Plates | |
179 or 1419 |
Volume 4, Appendix A | Hydrological studies | |
180 or 1420 |
Volume 5, Appendix B | Design development studies | |
181 or 95 or 1421 |
Volume 6, Appendix C | Cost estimates This volume has been revised. See link below. | |
182 or 1422 |
Volume 7, Appendix D | Coordination and public participation |
These documents are cataloged separately.
APA Number | Type of Resource | Content |
504-505 or 1619-1620 | Supplement (Final) |
Susitna Hydroelectric Project feasibility report. Supplement |
614 | Supplement (Draft) |
Susitna Hydroelectric Project. Draft Supplement to the feasibility report This is a draft of APA 504-505. Incomplete copy missing first portion of table of contents, all of chapters 11 and 12, and volume 2. |
1142 | Excerpt | Section 3 : Temperature regime of Susitna River below dams Four pages (leaves A4-5 to A4-8) from Volume 4. |
1291-1292 | First draft | Volume 1 of the first draft No other volume is available. |
1293 | Review | Review and testimonies on Acres feasibility report Reviews from the External Review Panel and from three environmental agencies. |
1423 | Revision | Feasibility report. Volume 6, Appendix C, Cost estimates, Final draft, November 1982 revisions |
3315 | Bibliography | Feasibility report, comprehensive bibliography : volume 1 and volume 2 |