Environmental assessment of the Taylor Highway-Klondike Highway realignment : El Paso Alaska Company, Docket no. CP75-96, et al.

This realignment is a proposed alternative route that deviates from the proposed Alcan Pipeline route. It deviates near Tetlin Junction and follows the Taylor Highway north to the junction of Top of the World Highway (called Boundary Highway in the report), and from there into Yukon where it meets u...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska natural gas transportation systems, Alcan Pipeline Project, environmental assessment, Taylor Highway-Klondike Highway realignment
Corporate Author: Federal Power Commission (FPC)
Document Type: Report
Publisher:Federal Power Commission (FPC)
Report Numbers:Docket no. CP75-96, et al.
Date:August 1977
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 02228cmm a22003253 4500
001 2810749
003 SIRSI
008 160621s1977 000 0 eng u
088 |a Docket no. CP75-96, et al. 
110 1 |a Federal Power Commission (FPC) 
245 1 0 |a Environmental assessment of the Taylor Highway-Klondike Highway realignment : El Paso Alaska Company, Docket no. CP75-96, et al. 
246 1 4 |a Alaska natural gas transportation systems, Alcan Pipeline Project, environmental assessment, Taylor Highway-Klondike Highway realignment 
260 |a Federal Power Commission (FPC) 
300 |a 80 p. 
380 |a Report 
518 |a August 1977 
546 |a English 
500 |a "Federal Power Commission Staff." 
500 |a Cover title: Alaska natural gas transportation systems, Alcan Pipeline Project, environmental assessment, Taylor Highway-Klondike Highway realignment. 
520 |a This realignment is a proposed alternative route that deviates from the proposed Alcan Pipeline route. It deviates near Tetlin Junction and follows the Taylor Highway north to the junction of Top of the World Highway (called Boundary Highway in the report), and from there into Yukon where it meets up with the Klondike Highway. From there the realignment runs southeast to Whitehorse, where the original route is resumed. 
505 |a Foreword -- Summary sheet -- Description of the proposed action -- Description of the existing environment -- Environmental impact of the realignment -- Measures to enhance the environment or to avoid or mitigate environmental effects -- Unavoidable adverse environmental impact -- Relationships between short-term use of man's environment and the maintenance and enhancement of long-term productivity -- Irreversible and irretrievable commitments of resources -- Alternatives to the proposed action -- Conclusion. 
651 |a Taylor Highway 
651 |a Top of the World Highway-Klondike Highway route 
653 |a Environmental analysis 
653 |a Alternatives 
653 |a Routing 
610 2 0 |a Alcan Pipeline Project 
690 |a PF-ENVI 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report4/Report_FPC_1977_EnvironmentalAssessmentTaylorHighway.pdf 
596 |a 10