Environmental assessment of the Taylor Highway-Klondike Highway realignment : El Paso Alaska Company, Docket no. CP75-96, et al.

This realignment is a proposed alternative route that deviates from the proposed Alcan Pipeline route. It deviates near Tetlin Junction and follows the Taylor Highway north to the junction of Top of the World Highway (called Boundary Highway in the report), and from there into Yukon where it meets u...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska natural gas transportation systems, Alcan Pipeline Project, environmental assessment, Taylor Highway-Klondike Highway realignment
Corporate Author: Federal Power Commission (FPC)
Document Type: Report
Publisher:Federal Power Commission (FPC)
Report Numbers:Docket no. CP75-96, et al.
Date:August 1977
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
Description
Summary:This realignment is a proposed alternative route that deviates from the proposed Alcan Pipeline route. It deviates near Tetlin Junction and follows the Taylor Highway north to the junction of Top of the World Highway (called Boundary Highway in the report), and from there into Yukon where it meets up with the Klondike Highway. From there the realignment runs southeast to Whitehorse, where the original route is resumed.
Physical Description:80 p.
Notes:"Federal Power Commission Staff."

Cover title: Alaska natural gas transportation systems, Alcan Pipeline Project, environmental assessment, Taylor Highway-Klondike Highway realignment.