Transportation resources study, Study plan Section 15.7, 2014 Study Implementation Report /

This study is being conducted to assess the effects of the proposed Susitna-Watana Hydroelectric Project on transportation infrastructure in the study area and to describe current transportation conditions there. The study documents existing transportation facilities, including their condition and l...

Full description

Saved in:
Bibliographic Details
Alternate Title:2014 Study Implementation Report. Transportation resources study (15.7)

Transportation resources study, Study plan Section 15.7, Initial Study Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

DOWL HKM (Firm),
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 289
Original Source:Preceded by (expression): Transportation resources study, Study plan Section 15.7, Initial Study Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 289.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This study is being conducted to assess the effects of the proposed Susitna-Watana Hydroelectric Project on transportation infrastructure in the study area and to describe current transportation conditions there. The study documents existing transportation facilities, including their condition and level of use, and identifies potential Project-related effects on road, railroad, port, and river traffic. The study area extends from Anchorage to Fairbanks and extends east to the Susitna River region. This document details Alaska Energy Authority's status in implementing the study during 2014, and is intended to supplement Part A of the Initial Study Report.
Physical Description:iv, 16 p. : 3 color maps ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

"October 2015."

ARLIS assigned report number: SuWa 289.
Report Type:November 2015; Study Completion and 2014/2015 Implementation Reports.
Original Source:Preceded by (expression): Transportation resources study, Study plan Section 15.7, Initial Study Report.
Bibliography:Includes bibliographical reference (page 12).
Related Items:Preceded by: Transportation resources study, Study plan Section 15.7, Initial Study Report / prepared by DOWL-HKM. -- June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223).