Transportation resources study, Study plan Section 15.7, 2014 Study Implementation Report /

This study is being conducted to assess the effects of the proposed Susitna-Watana Hydroelectric Project on transportation infrastructure in the study area and to describe current transportation conditions there. The study documents existing transportation facilities, including their condition and l...

Full description

Saved in:
Bibliographic Details
Alternate Title:2014 Study Implementation Report. Transportation resources study (15.7)

Transportation resources study, Study plan Section 15.7, Initial Study Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

DOWL HKM (Firm),
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 289
Original Source:Preceded by (expression): Transportation resources study, Study plan Section 15.7, Initial Study Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 289.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03846cam a2200613Ia 4500
001 2949952
003 SIRSI
005 20161212182709.0
007 ta
007 cr cn||a||||||
008 161212s2015 akub bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)965802260 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 289 sec. 15.7 
088 |a SuWa 289 
098 |a SuWa 00289 
245 0 0 |a Transportation resources study, Study plan Section 15.7, 2014 Study Implementation Report /  |c prepared by DOWL-HKM. 
246 1 7 |a 2014 Study Implementation Report.  |p Transportation resources study (15.7) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2015] 
300 |a iv, 16 p. :  |b 3 color maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 289 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a "October 2015." 
513 |a November 2015; Study Completion and 2014/2015 Implementation Reports. 
500 |a ARLIS assigned report number: SuWa 289. 
510 3 |a Listed in December 2015 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 2015; Study Completion and 2014/2015 Implementation Reports. 
580 |a Preceded by: Transportation resources study, Study plan Section 15.7, Initial Study Report / prepared by DOWL-HKM. -- June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223). 
530 |a Available also in electronic format on the Internet. 
520 |a This study is being conducted to assess the effects of the proposed Susitna-Watana Hydroelectric Project on transportation infrastructure in the study area and to describe current transportation conditions there. The study documents existing transportation facilities, including their condition and level of use, and identifies potential Project-related effects on road, railroad, port, and river traffic. The study area extends from Anchorage to Fairbanks and extends east to the Susitna River region. This document details Alaska Energy Authority's status in implementing the study during 2014, and is intended to supplement Part A of the Initial Study Report. 
504 |a Includes bibliographical reference (page 12). 
650 0 |a Transportation  |z Alaska. 
650 0 |a Dams  |x Economic aspects  |z Alaska. 
650 0 |a Hydroelectric power plants  |x Economic aspects  |z Alaska. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
650 4 |a Dams  |x Access roads  |z Alaska. 
610 2 7 |a Susitna-Watana Hydroelectric Project.  |2 fast  |0 (OCoLC)fst01917261 
650 7 |a Dams  |x Economic aspects.  |2 fast  |0 (OCoLC)fst00887339 
650 7 |a Hydroelectric power plants  |x Economic aspects.  |2 fast  |0 (OCoLC)fst00964941 
650 7 |a Transportation.  |2 fast  |0 (OCoLC)fst01155007 
651 7 |a Alaska.  |2 fast  |0 (OCoLC)fst01204480 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a DOWL HKM (Firm),  |e author. 
730 0 |i Preceded by (expression):  |a Transportation resources study, Study plan Section 15.7, Initial Study Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 289. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289sec15-7.pdf  |3 Link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289.html  |3 List of related "Study Completion Reports" and "2014-2015 Study Implementation reports" published in October and November 2015 and May 2016.  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201612 
596 |a 9 10