Transportation resources study, Study plan Section 15.7, Initial Study Report /

This study is being conducted to assess the effects of the proposed Susitna-Watana Hydroelectric Project on transportation infrastructure in the study area and to describe current transportation conditions there. The study documents existing transportation facilities, including their condition and l...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 15.7, Transportation resources study.

Initial Study Report. Transportation resources study (15.7)

Transportation resources study, Study plan Section 15.7, 2014 Study Implementation Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

DOWL HKM (Firm),
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Transportation resources study, Study plan Section 15.7, 2014 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This study is being conducted to assess the effects of the proposed Susitna-Watana Hydroelectric Project on transportation infrastructure in the study area and to describe current transportation conditions there. The study documents existing transportation facilities, including their condition and level of use, and identifies potential Project-related effects on road, railroad, port, and river traffic. The study area extends from Anchorage to Fairbanks and extends east to the Susitna River region. This document details Alaska Energy Authority's status in implementing the study.
Physical Description:170 pages in various pagings : color maps ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.
Report Type:Initial Study Report.
Original Source:Succeeded by (expression): Transportation resources study, Study plan Section 15.7, 2014 Study Implementation Report.
Bibliography:Includes bibliographical references.
Related Items:Succeeded by: Transportation resources study, Study plan Section 15.7, 2014 Study Implementation Report / prepared by DOWL-HKM. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).