Task 8, Transmission. Subtask 8.02, Closeout report. Electric system studies /
"The object of this work was to arrive at a system configuration that would ensure the reliable and economic transmission of Susitna generation to the Anchorage and Fairbanks load centers."--Leaf 1-1.
Saved in:
Alternate Title: | Subtask 8.02, Closeout report. Electric system studies Closeout report. Electric system studies Electric system studies Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.02, Closeout report. Electric system studies |
---|---|
Corporate Contributor(s): | Energy and Control Consultants. Alaska Power Authority. Acres American Incorporated. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 343 APA 1345 SUS 67 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 343. Document (Susitna Hydroelectric Project) ; no. 1345. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Electric system analyses
- System configuration
- Transmission line energizing
- Load flows
- Transient stability studies
- Supplementary studies energy management system (EMS)
- Attachment 1, Energy management system (EMS) system requirements report, task 8, transmission
- Attachment 2, Planning memorandum, Subtask 8.02, preliminary transmission system analysis.