Task 8, Transmission. Subtask 8.02, Closeout report. Electric system studies /
"The object of this work was to arrive at a system configuration that would ensure the reliable and economic transmission of Susitna generation to the Anchorage and Fairbanks load centers."--Leaf 1-1.
Saved in:
Alternate Title: | Subtask 8.02, Closeout report. Electric system studies Closeout report. Electric system studies Electric system studies Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.02, Closeout report. Electric system studies |
---|---|
Corporate Contributor(s): | Energy and Control Consultants. Alaska Power Authority. Acres American Incorporated. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 343 APA 1345 SUS 67 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 343. Document (Susitna Hydroelectric Project) ; no. 1345. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03471cam a2200709Ia 4500 | ||
---|---|---|---|
001 | 252467 | ||
003 | SIRSI | ||
005 | 20140613024204.0 | ||
007 | ta | ||
007 | he am||||b|ca | ||
007 | cr cn||||a|||| | ||
008 | 860605s1982 akuab st s000 0 eng d | ||
040 | |a AkU |c UAF |d RLA |d OCLCF |d RLA | ||
035 | |a (OCoLC)42983340 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 343 | |
088 | |a APA 343 | ||
088 | |a APA 1345 | ||
088 | |a SUS 67 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Task 8, Transmission. |n Subtask 8.02, |p Closeout report. |p Electric system studies / |c prepared by Acres. |
246 | 3 | 0 | |a Subtask 8.02, |p Closeout report. |p Electric system studies |
246 | 3 | 0 | |a Closeout report. |p Electric system studies |
246 | 3 | 0 | |a Electric system studies |
246 | 3 | |a Susitna Hydroelectric Project. |n Task 8, |p Transmission. |n Subtask 8.02, |p Closeout report. |p Electric system studies | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 256 p. in various pagings : |b ill., maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a [Document ; |v no. 343, 1345] | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a Additional author for Attachment 1, Energy management system (EMS) system requirements report: Energy and Control Consultants. | ||
513 | |a Closeout report. | ||
500 | |a "March 1982." | ||
510 | 3 | |a Assigned APA Document no. 343 in the Susitna Hydroelectric Project document index. Also assigned no. 1345 (duplicate entry). | |
510 | 3 | |a Assigned SUS document no. 67 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche and electronic format on the Internet. | ||
520 | |a "The object of this work was to arrive at a system configuration that would ensure the reliable and economic transmission of Susitna generation to the Anchorage and Fairbanks load centers."--Leaf 1-1. | ||
650 | 0 | |a Electric lines |z Alaska |v Statistics. | |
505 | 2 | |a Electric system analyses -- System configuration -- Transmission line energizing -- Load flows -- Transient stability studies -- Supplementary studies energy management system (EMS) -- Attachment 1, Energy management system (EMS) system requirements report, task 8, transmission -- Attachment 2, Planning memorandum, Subtask 8.02, preliminary transmission system analysis. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
650 | 0 | |a Electric lines |z Alaska. | |
650 | 0 | |a Electric power transmission |z Alaska. | |
650 | 0 | |a Electric power transmission |z Alaska |v Statistics. | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Electric lines. |2 fast |0 (OCoLC)fst00905095 | |
650 | 7 | |a Electric power transmission. |2 fast |0 (OCoLC)fst00905596 | |
651 | 7 | |a Alaska. |2 fast |0 (OCoLC)fst01204480 | |
710 | 2 | |a Energy and Control Consultants. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 343. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1345. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/3/APA343.pdf |z ARLIS Document Server |
901 | |a 0104 |c TK1424.A4 S98 no.8 vol.2 pt.C | ||
901 | |a 3755 | ||
596 | |a 9 10 11 | ||
098 | |a SUS 00067 | ||
098 | |a APA 00343 | ||
098 | |a APA 01345 | ||
710 | 2 | |a Alaska Power Authority. | |
655 | 7 | |a Statistics. |2 fast |0 (OCoLC)fst01423727 | |
710 | 2 | |a Acres American Incorporated. |