Task 8, Transmission. Subtask 8.02, Closeout report. Electric system studies /

"The object of this work was to arrive at a system configuration that would ensure the reliable and economic transmission of Susitna generation to the Anchorage and Fairbanks load centers."--Leaf 1-1.

Saved in:
Bibliographic Details
Alternate Title:Subtask 8.02, Closeout report. Electric system studies

Closeout report. Electric system studies

Electric system studies

Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.02, Closeout report. Electric system studies
Corporate Contributor(s):Energy and Control Consultants.

Alaska Power Authority.

Acres American Incorporated.
Publisher:Alaska Power Authority,
Report Numbers:APA 343

APA 1345

SUS 67
Series:Document (Susitna Hydroelectric Project) ; no. 343.
Document (Susitna Hydroelectric Project) ; no. 1345.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The object of this work was to arrive at a system configuration that would ensure the reliable and economic transmission of Susitna generation to the Anchorage and Fairbanks load centers."--Leaf 1-1.
Physical Description:256 p. in various pagings : ill., maps ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

Additional author for Attachment 1, Energy management system (EMS) system requirements report: Energy and Control Consultants.

"March 1982."
Report Type:Closeout report.