Susitna Project supplemental report, low Watana Dam RCC concept cost evaluation : final /

For the Watana Dam on the Susitna River, the option of a roller-compacted concrete (RCC) dam has been suggested for consideration. The consultants developed a conceptual design and performed concept level cost estimates for a RCC dam at the Watana and Devil Canyon sites as described in the report &q...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Project supplemental report, low Watana Dam roller compacted concrete concept cost evaluation : final

Supplemental report - low Watana RCC concept
Corporate Contributor(s):R & M Consultants.

Hatch Associates Consultants, Inc.

Jack Linard Consulting.

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 216
Series:Susitna-Watana Hydroelectric Project document ; no. 216.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03142cam a2200529Ia 4500
001 2040382
003 SIRSI
005 20140620043903.0
007 ta
007 cr cn||||a||||
008 140619s2010 akube b s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)881507175 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 216 
088 |a SuWa 216 
049 |a RLAA 
245 0 0 |a Susitna Project supplemental report, low Watana Dam RCC concept cost evaluation :  |b final /  |c prepared by R & M Consultants, Hatch Associates Consultants, Jack Linard Consulting. 
246 3 |a Susitna Project supplemental report, low Watana Dam roller compacted concrete concept cost evaluation :  |b final 
246 1 7 |a Supplemental report - low Watana RCC concept 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2010] 
300 |a iii, 21, [22], 61 p. :  |b 2 maps, 13 plans ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 216 
500 |a "November 29, 2010." 
500 |a ARLIS assigned report number: SuWa 216. 
500 |a Posted on the Alaska Energy Authority's "Railbelt large hydro reports" webpage; available as of June 16, 2014. 
530 |a Available also in electronic format on the Internet. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
520 |a For the Watana Dam on the Susitna River, the option of a roller-compacted concrete (RCC) dam has been suggested for consideration. The consultants developed a conceptual design and performed concept level cost estimates for a RCC dam at the Watana and Devil Canyon sites as described in the report "Susitna RCC dam cost evaluation : final" dated November 16, 2009. This report is considered an addendum that that report. In addition, this report explores the advantages and disadvantages of an underground versus surface powerhouse, and transportation options utilizing updated information on railroad costs in conjunction with "rail only" surface transport to the project. 
505 0 |a Executive summary -- Introduction -- Project layout -- Project access issues -- Cost estimates -- Project schedule -- Figures -- appendix A. Breakdown of unit cost analysis for RCC -- appendix B. Detailed construction cost. 
504 |a Includes bibliographical references (first sequence, p. 21). 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction. 
650 0 |a Roller compacted concrete. 
710 2 |a R & M Consultants. 
710 2 |a Hatch Associates Consultants, Inc. 
710 2 |a Jack Linard Consulting. 
710 2 |a Alaska Energy Authority. 
772 0 |7 unam  |t Susitna RCC dam cost evaluation.  |d [Anchorage : Alaska Energy Authority, 2009]  |r SuWa 197  |w (OCoLC)528992984 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 216. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa216.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00216