Susitna RCC dam cost evaluation : final /

For the Devil Canyon Dam and Watana Dam on the Susitna River, the option of roller-compacted concrete (RCC) dams have been suggested for consideration. The consultants developed a conceptual design and performed concept level cost estimates for RCC dams at these sites.

Saved in:
Bibliographic Details
Alternate Title:Susitna roller compacted concrete dam cost evaluation : final

Susitna Project Watana and High Devil Canyon RCC dam cost evaluation : final

Susitna Project Watana and High Devil Canyon roller compacted concrete dam cost evaluation : final

AEA - Sustina RCC dam cost evaluation
Corporate Contributor(s):R & M Consultants.

Hatch Acres (Firm)

Jack Linard Consulting.

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 197
Series:Susitna-Watana Hydroelectric Project document ; no. 197.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:For the Devil Canyon Dam and Watana Dam on the Susitna River, the option of roller-compacted concrete (RCC) dams have been suggested for consideration. The consultants developed a conceptual design and performed concept level cost estimates for RCC dams at these sites.
Physical Description:191 p. in various pagings : col. ill., maps, plans ; 28 cm.
Notes:"November 16, 2009."

Page footer dated "11/17/2009."

ARLIS assigned report number: SuWa 197.

Listed on the Alaska Energy Authority's Susitna "Susitna reports" webpage on September 23, 2013.
Bibliography:Includes bibliographical references (p. 91-94).