Study of fish passage feasibility at Watana Dam, Study plan Section 9.11, Final study plan /

The study will explore various alternatives in support of three basic strategies related to fish passage: (1) the proposed Susitna-Watana Hydroelectric Project without fish passage, (2) integration of upstream and downstream passage features into the current dam design, and (3) the retrofit of upstr...

Full description

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Study of fish passage feasibility at Watana Dam 9.11
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02630cam a2200517Ia 4500
001 2018363
003 SIRSI
005 20140212011203.0
007 ta
007 cr cn||||a||||
008 140212s2013 akub b s000 0 eng d
035 |a (OCoLC)870339784 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 200 
088 |a SuWa 200 
110 2 |a Alaska Energy Authority. 
240 1 0 |a Final study plan.  |n Study plan Section 9.11,  |p Study of fish passage feasibility at Watana Dam 
245 1 0 |a Study of fish passage feasibility at Watana Dam, Study plan Section 9.11, Final study plan /  |c Alaska Energy Authority. 
246 1 7 |a Final study plan.  |p Study of fish passage feasibility at Watana Dam 9.11 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2013] 
300 |a 12 p. :  |b 1 col. map ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200 
500 |a "July 2013." 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a ARLIS assigned report number: SuWa 200. 
513 |a Final study plan. 
510 3 |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. 
530 |a Available also in electronic format on the Internet. 
520 |a The study will explore various alternatives in support of three basic strategies related to fish passage: (1) the proposed Susitna-Watana Hydroelectric Project without fish passage, (2) integration of upstream and downstream passage features into the current dam design, and (3) the retrofit of upstream and downstream fish passage features to a dam designed without passage. 
504 |a Includes bibliographical references (page "9.11-9"). 
650 0 |a Fishways  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Fishes  |x Migration  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Research. 
043 |a n-us-ak 
710 2 |a Susitna-Watana Hydroelectric Project. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec9-11.pdf  |3 Direct link to this section.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html  |3 List of related Final Study Plans.  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00200