Study of fish passage feasibility at Watana Dam, Study plan Section 9.11, Initial Study Report /

This study is being conducted to develop a fish passage strategy in support of the license application for the Susitna-Watana Hydroelectric Project. The study will explore various alternatives in support of three basic strategies related to fish passage: (1) the proposed Susitna-Watana Hydroelectric...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 9.11, Study of fish passage feasibility at Watana Dam.

Initial Study Report. Study of fish passage feasibility at Watana Dam (9.11)

Fish passage feasibility at Watana Dam, Study plan Section 9.11, 2014 Study Implementation Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

R2 Resource Consultants,

LGL Alaska Research Associates,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Fish passage feasibility at Watana Dam, Study plan Section 9.11, 2014 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This study is being conducted to develop a fish passage strategy in support of the license application for the Susitna-Watana Hydroelectric Project. The study will explore various alternatives in support of three basic strategies related to fish passage: (1) the proposed Susitna-Watana Hydroelectric Project without fish passage, (2) integration of upstream and downstream passage features into the current dam design, and (3) the retrofit of upstream and downstream fish passage features to a dam designed without passage.
Physical Description:504 pages in various pagings : color illustrations, color maps, color charts ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.

Appendices A and B do not have appendix title pages. Appendices C and D have appendix title pages with statement: "Prepared by R2 Resource Consultants, Inc. & LGL Alaska Research Associates, Inc."
Report Type:Initial Study Report.
Original Source:Succeeded by (expression): Fish passage feasibility at Watana Dam, Study plan Section 9.11, 2014 Study Implementation Report.
Bibliography:Includes bibliographical references (Part A: pages 9-11).
Related Items:Succeeded by: Fish passage feasibility at Watana Dam, Study plan Section 9.11, 2014 Study Implementation Report / prepared by R2 Resource Consultants, Inc. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).