Transportation resources study, Study plan Section 15.7, Final study plan /

This study will assess current transportation conditions in the Susitna-Watana Hydroelectric Project area and evaluate potential Project demands relative to current capacity limits and safety requirements for road, railroad, aviation, port, and river traffic. The study will assess the short-term (co...

Full description

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Transportation resources study 15.7
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02679cam a2200505Ia 4500
001 2017077
003 SIRSI
005 20150216160556.0
007 ta
007 cr cn||a||||||
008 140204s2013 aku bt s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)869838116 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 200 sec. 15.7 
088 |a SuWa 200 
110 2 |a Alaska Energy Authority. 
240 1 0 |a Final study plan.  |n Study plan Section 15.7,  |p Transportation resources study 
245 1 0 |a Transportation resources study, Study plan Section 15.7, Final study plan /  |c Alaska Energy Authority. 
246 1 7 |a Final study plan.  |p Transportation resources study 15.7 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2013] 
300 |a 10 p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200 
500 |a "July 2013." 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a ARLIS assigned report number: SuWa 200. 
513 |a Final study plan. 
510 3 |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. 
530 |a Available also in electronic format on the Internet. 
520 |a This study will assess current transportation conditions in the Susitna-Watana Hydroelectric Project area and evaluate potential Project demands relative to current capacity limits and safety requirements for road, railroad, aviation, port, and river traffic. The study will assess the short-term (construction) and long-term (operational) direct and indirect effects of the Project, as well as of the cumulative effects of the Project. The study area extends from Anchorage to Fairbanks. 
504 |a Includes bibliographical references (page "15.7-6"). 
650 0 |a Transportation  |x Research  |z Alaska. 
650 0 |a Hydroelectric power plants  |x Economic aspects  |x Research  |z Alaska. 
650 0 |a Dams  |x Economic aspects  |x Research  |z Alaska. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Research. 
650 4 |a Dams  |x Access roads  |x Research  |z Alaska. 
710 2 |a Susitna-Watana Hydroelectric Project. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec15-7.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html  |3 List of related Final Study Plans.  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00200