Transportation resources study, Study plan Section 15.7, Final study plan /
This study will assess current transportation conditions in the Susitna-Watana Hydroelectric Project area and evaluate potential Project demands relative to current capacity limits and safety requirements for road, railroad, aviation, port, and river traffic. The study will assess the short-term (co...
Saved in:
Alternate Title: | Final study plan. Final study plan. Transportation resources study 15.7 |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This study will assess current transportation conditions in the Susitna-Watana Hydroelectric Project area and evaluate potential Project demands relative to current capacity limits and safety requirements for road, railroad, aviation, port, and river traffic. The study will assess the short-term (construction) and long-term (operational) direct and indirect effects of the Project, as well as of the cumulative effects of the Project. The study area extends from Anchorage to Fairbanks. |
---|---|
Physical Description: | 10 p. ; 28 cm. |
Notes: | "July 2013." "Susitna-Watana Hydroelectric Project (FERC No. 14241)." ARLIS assigned report number: SuWa 200. |
Report Type: | Final study plan. |
Bibliography: | Includes bibliographical references (page "15.7-6"). |