Backup Book E, Devil Canyon - concrete costs.

A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the planned arch Devil Canyon Dam, part of the Susitna Hydroelectric Project.

Saved in:
Bibliographic Details
Alternate Title:Book E. Backup Book E, Devil Canyon - concrete costs.

Title entered in the Susitna Hydroelectric Project document index as: Devil Canyon concrete works, Book E, Task 9 - Group 12

Title on label on binder cover (difficult to read due to poor reproduction): Task 9 - Group 12, Book E, Devil Canyon concrete works

Caption title on page 1 (table of contents page): Unit prices - backup calculations, Devil Canyon, concrete works

(E). Unit prices - backup calculations, Devil Canyon, concrete works
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 255
Series:Document (Susitna Hydroelectric Project) ; no. 255.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03710cam a2200577Ia 4500
001 1991706
003 SIRSI
005 20140523011043.0
007 ta
007 cr bn||||a||||
008 140102s1982 nyu t 000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)867056859 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 255 
088 |a APA 255 
049 |a RLAA 
130 0 |a Book E.  |p Backup Book E, Devil Canyon - concrete costs. 
245 1 0 |a Backup Book E, Devil Canyon - concrete costs. 
246 1 |i Title entered in the Susitna Hydroelectric Project document index as:  |a Devil Canyon concrete works, Book E, Task 9 - Group 12 
246 1 |i Title on label on binder cover (difficult to read due to poor reproduction):  |a Task 9 - Group 12, Book E, Devil Canyon concrete works 
246 1 |i Caption title on page 1 (table of contents page):  |a Unit prices - backup calculations, Devil Canyon, concrete works 
246 3 |a (E).  |p Unit prices - backup calculations, Devil Canyon, concrete works 
260 |a [Buffalo, N.Y.? :  |b Acres American Incorporated,  |c 1982] 
300 |a p. 11-13, 173 p. [i.e. 152 p.] ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 255 
500 |a Title from label on what appears to be the title page from a poor reproduction. Series statement from label on cover and title page. 
500 |a At head of caption title on page 1: (E). 
500 |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. 
500 |a Paging is handwritten up to 173. Cataloging is based on copy lacking pages for some page numbers. The two memorandums (numbered page 11-13) precede page 1. Total number of pages is 152. 
510 3 |a Assigned APA Document no. 255 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
500 |a Includes two Acres office memorandums to Dave H. MacDonald and others from James R. Plummer dated January 16 and 20, 1982. 
520 |a A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the planned arch Devil Canyon Dam, part of the Susitna Hydroelectric Project. 
505 0 |a Summary -- Structures -- Summary -- Powerhouse -- Transformer gallery -- Auxiliary spillway -- Emergency spillway -- Surge chamber -- Intake -- Bus tunnels & shafts -- Summary -- Division tunnel -- Tailrace tunnel -- Main access tunnel -- Grout galleries -- Cable shaft -- Access shaft -- Penstocks -- Forming crews -- Placing crews -- Supply of concrete -- Concrete production -- Cement -- Coarse aggregate -- Fine aggregate -- Supply & install rebar. 
610 2 0 |a Devil Canyon Project  |x Planning. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Concrete  |x Costs. 
650 0 |a Arch dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 255. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/2/APA255.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 00255