Unit costs - backup calculations, manpower costs/cash flows.

A collection of worksheets (called 'Calculations'), graphs, and a few typed tables from Acres American Incorporated regarding estimated labor costs for constructing the Devil Canyon Dam and Watana Dam in the Susitna Hydroelectric Project.

Saved in:
Bibliographic Details
Alternate Title:Book M. Unit costs - backup calculations, manpower costs/cash flows.

(M). Unit costs - backup calculations, manpower costs/cash flows
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 110
Series:Document (Susitna Hydroelectric Project) ; no. 110.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:A collection of worksheets (called 'Calculations'), graphs, and a few typed tables from Acres American Incorporated regarding estimated labor costs for constructing the Devil Canyon Dam and Watana Dam in the Susitna Hydroelectric Project.
Physical Description:97 p. : ill., charts ; 28 cm.
Notes:At head of title: (M).

This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc.

Series statement from label on title page (numbered page 1).

Sheets are dated 1982.

Cataloging based on copy lacking page 49. Cover and real title page missing?