First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Woodward-Clyde Consultants. |
Publisher: | [Woodward-Clyde Consultants?], |
Report Numbers: | SUS 411 |
Edition: | Draft. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | [5], 87, [138] p. : ill., maps, plans ; 28 cm. |
---|---|
Notes: | At head of title: Susitna Hydroelectric Project. "Draft" stamped on title page. "Confidential: Privileged work product prepared in anticipation of litigation; restricted distribution." "November 1984." After microfilming, all or most copies were lost. All known copies (printouts, PDF, microfiche) are based on the microfilming which include the following: hand-written editorial notes on pages 2-24 and [90], page 2 is scanned multiple times with and without a slip with an editorial note; and oversize figures 32, 33, and 36 filmed as multiple pages. |
Bibliography: | Includes bibliographical references (leaves [88]-[90]). |