First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River
Corporate Contributor(s):Susitna Hydroelectric Project.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Woodward-Clyde Consultants.
Publisher:[Woodward-Clyde Consultants?],
Report Numbers:SUS 411
Edition:Draft.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:[5], 87, [138] p. : ill., maps, plans ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"Draft" stamped on title page.

"Confidential: Privileged work product prepared in anticipation of litigation; restricted distribution."

"November 1984."

After microfilming, all or most copies were lost. All known copies (printouts, PDF, microfiche) are based on the microfilming which include the following: hand-written editorial notes on pages 2-24 and [90], page 2 is scanned multiple times with and without a slip with an editorial note; and oversize figures 32, 33, and 36 filmed as multiple pages.
Bibliography:Includes bibliographical references (leaves [88]-[90]).