First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Woodward-Clyde Consultants. |
Publisher: | [Woodward-Clyde Consultants?], |
Report Numbers: | SUS 411 |
Edition: | Draft. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03060cam a2200541Ia 4500 | ||
---|---|---|---|
001 | 1952635 | ||
003 | SIRSI | ||
005 | 20130625015549.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
007 | he bmu---bbca | ||
008 | 130625e198411 akuabe bst s000 0 eng d | ||
035 | |a (OCoLC)850531845 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
088 | |a SUS 411 | ||
090 | |a TK1425.S8 |b S9 no. 411 | ||
245 | 0 | 0 | |a First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River / |c prepared by Woodward-Clyde Consultants ; submitted to Harza-Ebasco Susitna Joint Venture ; for the Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River | |
250 | |a Draft. | ||
260 | |a [Anchorage, Alaska] : |b [Woodward-Clyde Consultants?], |c [1984] | ||
300 | |a [5], 87, [138] p. : |b ill., maps, plans ; |c 28 cm. | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "Draft" stamped on title page. | ||
500 | |a "Confidential: Privileged work product prepared in anticipation of litigation; restricted distribution." | ||
500 | |a "November 1984." | ||
510 | 3 | |a Assigned SUS document number 411 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
500 | |a After microfilming, all or most copies were lost. All known copies (printouts, PDF, microfiche) are based on the microfilming which include the following: hand-written editorial notes on pages 2-24 and [90], page 2 is scanned multiple times with and without a slip with an editorial note; and oversize figures 32, 33, and 36 filmed as multiple pages. | ||
505 | 0 | |a Introduction -- Mitigation options : historical perspective -- Susitna River mitigation plan -- appendix A. Passage reach flow evaluation -- appendix B. Detailed mitigation costs -- Interim mitigation plan for arctic grayling habitat in the impoundment area. ([5] p.). | |
504 | |a Includes bibliographical references (leaves [88]-[90]). | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Environmental aspects. |
650 | 0 | |a Chum salmon |x Habitat |z Alaska |z Susitna River. | |
650 | 0 | |a Chum salmon |x Spawning |z Alaska |z Susitna River. | |
650 | 0 | |a Chum salmon |x Effect of dams on |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Environmental aspects |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) |x Channels. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Woodward-Clyde Consultants. | |
740 | 0 | 2 | |a Interim mitigation plan for arctic grayling habitat in the impoundment area. |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/SUS/4/SUS411.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SUS 00411 |