First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River
Corporate Contributor(s):Susitna Hydroelectric Project.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Woodward-Clyde Consultants.
Publisher:[Woodward-Clyde Consultants?],
Report Numbers:SUS 411
Edition:Draft.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Mitigation options : historical perspective
  • Susitna River mitigation plan
  • appendix A. Passage reach flow evaluation
  • appendix B. Detailed mitigation costs
  • Interim mitigation plan for arctic grayling habitat in the impoundment area. ([5] p.).