First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. First interim mitigation plan for chum salmon spawning habitat in side sloughs of the middle Susitna River |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Woodward-Clyde Consultants. |
Publisher: | [Woodward-Clyde Consultants?], |
Report Numbers: | SUS 411 |
Edition: | Draft. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Mitigation options : historical perspective
- Susitna River mitigation plan
- appendix A. Passage reach flow evaluation
- appendix B. Detailed mitigation costs
- Interim mitigation plan for arctic grayling habitat in the impoundment area. ([5] p.).