El Paso Alaska Company, Docket nos. CP75-96, et al., prepared answering testimony and hearing exhibits. Dated May 18, 1976
This document contains the testimony of Paul C. Wright (of Pipe Line Technologists, Inc.), Robert H. Winn (Manager of Anchorage office of Dames & Moore), and R. Sage Murphy (Director of Pollution Control Services at Dames & Moore) about the realignment of the natural gas pipeline proposed by...
Saved in:
Alternate Title: | Prepared answering testimony and hearing exhibits |
---|---|
Main Authors: | , , |
Corporate Author(s): | , |
Corporate Contributor(s): | Federal Power Commission (FPC) |
Document Type: | Legal Map Technical drawings |
Publisher: | El Paso Alaska Company |
Report Numbers: | Docket nos. CP75-96, et al. |
Date: | May 18, 1976 |
Sponsor / Funder: | Federal Power Commission (FPC) |
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
LEADER | 03593cmm a22004693 4500 | ||
---|---|---|---|
001 | 2813341 | ||
003 | SIRSI | ||
008 | 160708s1976 000 0 eng u | ||
088 | |a Docket nos. CP75-96, et al. | ||
100 | 1 | |a Wright, Paul C. | |
100 | 1 | |a Murphy, R. Sage | |
100 | 1 | |a Winn, Robert H. | |
110 | 2 | |a Dames & Moore | |
110 | 2 | |a El Paso Alaska Company | |
245 | 1 | 0 | |a El Paso Alaska Company, Docket nos. CP75-96, et al., prepared answering testimony and hearing exhibits. Dated May 18, 1976 |
246 | 3 | 0 | |a Prepared answering testimony and hearing exhibits |
260 | |a El Paso Alaska Company | ||
300 | |a 215 p. | ||
380 | |a Legal | ||
380 | |a Map | ||
380 | |a Technical drawings | ||
518 | |a May 18, 1976 | ||
546 | |a English | ||
500 | |a This testimony was submitted to the Federal Power Commission by El Paso Alaska Company of El Paso, Texas. | ||
500 | |a The realignment sheets is an atlas of 35 maps of the realigned route from Prudhoe Bay to Orca Bay (at Gravina Point). The cross section exhibit includes an index page plus 14 cross section plates. | ||
505 | 0 | |a Prepared answering testimony of Paul C. Wright -- Description of facilities appendix: Proposed Alaskan Gas Pipeline, pipeline topographic realignment sheets -- El Paso Alaska Gas Pipeline realignment : typical cross sections of the realigned pipeline -- Prepared answering testimony of Robert H. Winn -- Geotechnical feasibility of utilizing the Trans-Alaska Pipeline System alignment as a combined alignment for a hot oil pipeline and a chilled gas pipeline / prepared by Dames & Moore. (iv, 42 pages.) -- Seasonal flow diagrams -- Average day flow diagram -- Flow diagram for maximum capacity -- Summary of the impact on the capital cost estimate by realignment of the Alaskan Gas Pipeline -- Prepared answering testimony of R. Sage Murphy -- Alaskan Gas Pipeline, list of pipeline crossings -- Alaskan Gas Pipeline, list of road crossings -- Alaska Gas Pipeline, list of stream crossings -- El Paso Alaska Company pipeline realignment study supplemental environmental considerations / prepared by Dames & Moore. (iii, 53, [5] pages). | |
520 | |a This document contains the testimony of Paul C. Wright (of Pipe Line Technologists, Inc.), Robert H. Winn (Manager of Anchorage office of Dames & Moore), and R. Sage Murphy (Director of Pollution Control Services at Dames & Moore) about the realignment of the natural gas pipeline proposed by El Paso (known as the Trans-Alaska Gas Project). Large sets of exhibits (text, maps, graphs, and drawings) accompany each testimony. The purpose of the realignment is to utilize the Haul Road and the pipeline work pad now in place for Alyeska's Trans-Alaska Pipeline System. The three persons discuss the geotechnical feasibility and environmental aspects of the realignment. | ||
653 | |a Testimony | ||
653 | |a Realignment | ||
653 | |a Routing | ||
653 | |a Environmental analysis | ||
653 | |a Geotechnical analysis | ||
610 | 2 | |a Trans-Alaska Gas Project (T-AGP) | |
651 | |a Prudhoe Bay to Valdez route | ||
690 | |a PF-ENVI | ||
690 | |a PF-CONS | ||
710 | 2 | |a Federal Power Commission (FPC) | |
740 | 0 | 2 | |a Geotechnical feasibility of utilizing the Trans-Alaska Pipeline System alignment as a combined alignment for a hot oil pipeline and a chilled gas pipeline |
740 | 0 | 2 | |a El Paso Alaska Company pipeline realignment study supplemental environmental considerations |
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Legal/Legal_ElPaso_1976_PreparedAnsweringTestimony&Hearing.pdf |
901 | |a ARLIS |c orig 201607 | ||
596 | |a 10 |