Disposition of Alyeska Pipeline Service Company (Alyeska)-Northwest Alaskan Pipeline Company (NWA) final unresolved issues in the Design criteria manual

Alyeska Pipeline Service Company maintains unresolved issues in regards to Northwest Alaskan Pipeline Company's pipeline designs. These issues were transmitted to and discussed with the Office of Federal Inspector (OFI) in 1985. OFI assessed these issues and lists them in this memo separated in...

Full description

Saved in:
Bibliographic Details
Main Author: Ellis, Earl
Document Type: Memorandum
Publisher:Office of the Federal Inspector (OFI)
Date:April 15, 1985
Addressee / Recipient:Rhett, John T., Jr.
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 02614cmm a22003373 4500
001 2064794
003 SIRSI
008 141015s1985 000 0 eng u
100 1 |a Ellis, Earl 
245 1 0 |a Disposition of Alyeska Pipeline Service Company (Alyeska)-Northwest Alaskan Pipeline Company (NWA) final unresolved issues in the Design criteria manual 
260 |a Office of the Federal Inspector (OFI) 
300 |a 5 p. 
380 |a Memorandum 
518 |a April 15, 1985 
546 |a English 
500 |a Title from subject line. 
500 |a A memorandum from Earl Ellis (Civil Engineer, Anchorage, Alaska) to John T. Rhett (Federal Inspector for the Alaska Natural Gas Transportation System). 
500 |a One of four pieces of correspondence on regulatory action regarding frost heaves and the Trans-Alaska Pipeline that comprise one special set of related documents. This letter is cited in John Rhett's letter dated April 16, 1985 called: Resolution of Alyeska Pipeline Service Company comments on ANGTS Pipeline design criteria manual (DCM). 
500 |a This set of correspondence is archived in Box 1, File 1.a of the document collection for Office of the Federal Inspector for the Alaska Natural Gas Transportation System, housed at National Archives and Records Administration, Washington, D.C. 
500 |a Top sentence on page 5 is partially cut-off (but essentially readable) in the digital file. 
520 |a Alyeska Pipeline Service Company maintains unresolved issues in regards to Northwest Alaskan Pipeline Company's pipeline designs. These issues were transmitted to and discussed with the Office of Federal Inspector (OFI) in 1985. OFI assessed these issues and lists them in this memo separated into three categories: (1) Alyeska issues that have been resolved, (2) Alyeska issues which should be addressed by NWA and reviewed further, and (3) Alyeska issues which OFI considers invalid within the context of the Design criteria manual. All these issues deal with frozen soil conditions and frost heaves. 
610 |a Alyeska Pipeline Service Company 
610 |a Northwest Alaskan Pipeline Company 
653 |a Frost heave 
653 |a Soil 
653 |a Design and construction 
690 |a PF-CONS 
700 |a Rhett, John T., Jr. 
740 0 |a Pipeline design criteria manual (Revision 4) 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Letter/Letter_OFI_1981-1985_DesignCriteria.pdf  |z PDF contains the set of three pieces of correspondence and one excerpt from the Federal register. This memo appears as the second document in this PDF file 
596 |a 10