Point Thomson Project EIS, final environmental impact statement
This environmental impact statement describes a project to produce hydrocarbon liquids (gas condensate and possibly oil) from the Thomson Sand Reservoir and deliver them through the Trans-Alaska Pipeline System. The project will delineate and evaluate hydrocarbon resources in the Point Thomson Unit....
Saved in:
Alternate Title: | Point Thomson Project final EIS Point Thomson Project environmental impact statement, final environmental impact statement |
---|---|
Document Type: | Report |
Publisher: | U.S. Army Corps of Engineers. Alaska District. Regulatory Division |
Date: | July 2012 |
Subjects: | |
Online Access: | View Full Text View Full Text |
Library Holdings: | Print Versions |
LEADER | 01850cmm a22003133 4500 | ||
---|---|---|---|
001 | 1479758 | ||
003 | SIRSI | ||
008 | 121228n2012 000 0 eng u | ||
245 | |a Point Thomson Project EIS, final environmental impact statement | ||
246 | |a Point Thomson Project final EIS | ||
246 | |a Point Thomson Project environmental impact statement, final environmental impact statement | ||
260 | |a U.S. Army Corps of Engineers. Alaska District. Regulatory Division | ||
518 | |a July 2012 | ||
300 | |a 37 PDF files (originally: 3 print vols. + 1 print summary + 26 appendices on DVD) | ||
380 | |a Report | ||
546 | |a English | ||
500 | |a Running tile: Point Thomson Project final EIS | ||
520 | |a This environmental impact statement describes a project to produce hydrocarbon liquids (gas condensate and possibly oil) from the Thomson Sand Reservoir and deliver them through the Trans-Alaska Pipeline System. The project will delineate and evaluate hydrocarbon resources in the Point Thomson Unit. The plan, to be located 60 miles east of Prudhoe Bay, features a three-pad configuration using long-reach directional drilling from onshore pads. The central processing facility is located on an expanded existing central pad. | ||
505 | 0 | |a v. 1. Table of contents-Chapter 3 -- v. 2. Chapter 4-Chapter 5, section 5.17 -- v. 3. Chapter 5, section 5.18-Chapter 11 -- DVD. Appendices A-Y. | |
610 | |a Point Thomson Project | ||
653 | |a Environmental impacts | ||
653 | |a Project description | ||
651 | |a Point Thomson | ||
653 | |a Pipelines | ||
653 | |a Petroleum | ||
653 | |a Gas condensate | ||
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report3/Report_PtThom_FEIS/v1.pdf |3 First volume in set |
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report3/Report_PtThom_FEIS/index.html |3 Webpage for full report |
596 | |a 10 |