Alaska Pipeline Project draft resource report 1, general project description. Appendix 1K, Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures
These procedures address the requirements of the FERC procedures except where measures modified in 2003 are unconsidered unnecessary, infeasible, or unstuitable due to local conditions.
Saved in:
Alternate Title: | Appendix 1K, Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures Alaska Pipeline Project, rights-of-way widths by milepost |
---|---|
Corporate Author(s): | , , , |
Corporate Contributor(s): | Federal Energy Regulatory Commission (FERC) |
Document Type: | Report |
Publisher: | Alaska Pipeline Project (APP) |
Report Numbers: | FERC docket no. PF09-11-000 USAG-UR-SGREG-000002 |
Date: | December 2011 |
Sponsor / Funder: | Federal Energy Regulatory Commission (FERC) |
Edition: | Draft, Revision 0 |
Subjects: | |
Online Access: | View Full Text View Full Text |
Library Holdings: | Print Versions |
LEADER | 01819cmm a22004213 4500 | ||
---|---|---|---|
001 | 1467591 | ||
003 | SIRSI | ||
008 | 120815n2011 000 0 eng u | ||
110 | |a Alaska Pipeline Project (APP) | ||
088 | |a FERC docket no. PF09-11-000 | ||
088 | |a USAG-UR-SGREG-000002 | ||
245 | 1 | 0 | |a Alaska Pipeline Project draft resource report 1, general project description. Appendix 1K, Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures |
246 | |a Appendix 1K, Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures | ||
246 | |a Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures | ||
246 | |a Alaska Pipeline Project, rights-of-way widths by milepost | ||
250 | |a Draft, Revision 0 | ||
260 | |a Alaska Pipeline Project (APP) | ||
300 | |a 92 p. | ||
380 | |a Report | ||
546 | |a English | ||
518 | |a December 2011 | ||
520 | |a These procedures address the requirements of the FERC procedures except where measures modified in 2003 are unconsidered unnecessary, infeasible, or unstuitable due to local conditions. | ||
610 | |a Alaska Pipeline Project (APP) | ||
653 | |a Mitigation | ||
653 | |a Project description | ||
653 | |a Design and construction | ||
653 | |a Wetlands | ||
653 | |a Waterbodies | ||
110 | |a ExxonMobil | ||
110 | |a TransCanada | ||
110 | |a Foothills Pipe Lines Ltd. | ||
690 | |a PF-PROJ | ||
690 | |a PF-ENVI | ||
690 | |a PF-CONS | ||
710 | |a Federal Energy Regulatory Commission (FERC) | ||
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_DRR/DraftResourceReport1K.pdf |y Link to this volume |
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_DRR/index.html |y Webpage linking all volumes |
596 | |a 10 |