Alaska Pipeline Project draft resource report 1, general project description. Appendix 1K, Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures

These procedures address the requirements of the FERC procedures except where measures modified in 2003 are unconsidered unnecessary, infeasible, or unstuitable due to local conditions.

Saved in:
Bibliographic Details
Alternate Title:Appendix 1K, Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures

Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures

Alaska Pipeline Project, rights-of-way widths by milepost
Corporate Author(s): Alaska Pipeline Project (APP), ExxonMobil, TransCanada, Foothills Pipe Lines Ltd.
Corporate Contributor(s):Federal Energy Regulatory Commission (FERC)
Document Type: Report
Publisher:Alaska Pipeline Project (APP)
Report Numbers:FERC docket no. PF09-11-000

USAG-UR-SGREG-000002
Date:December 2011
Sponsor / Funder:Federal Energy Regulatory Commission (FERC)
Edition:Draft, Revision 0
Subjects:
Online Access:View Full Text
View Full Text
Library Holdings:Print Versions
Description
Summary:These procedures address the requirements of the FERC procedures except where measures modified in 2003 are unconsidered unnecessary, infeasible, or unstuitable due to local conditions.
Physical Description:92 p.