Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through J /
Saved in:
Contents:
- A. Generic plan formulation and selection methodology
- B. Thermal generating resources
- C. Alternative hydro generating sources
- D. Engineering layout design assumptions
- E. Susitna Basin screening model
- F. Single and multi-reservoir hydropower simulation studies
- G. Systemwide economic evaluation
- H. Engineering studies
- I. Environmental studies
- J. Agency and other comments.