Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through J /

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through J

Subtask 6.05. Development selection report. Appendices A through J

Development selection report. Appendices A through J

Susitna Hydroelectric Project. Development selection report. Appendices A through J. Task 6, Design development

Development selection report. Appendices A through J. Task 6, Design development

Design development

Appendices A through J

Preliminary environmental assessment of tunnel alternatives.

Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin.
Corporate Contributor(s):Alaska Power Authority.

Acres American Incorporated.

Susitna Hydroelectric Project.
Publisher:Alaska Power Authority,
Report Numbers:APA 221

APA 1436

SUS 43 (v. 2)
Original Source:Preliminary environmental assessment of tunnel alternatives. [Version with December 1981 updated plans and table]

Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin.
Edition:[December 1981 edition].
Series:Document (Susitna Hydroelectric Project) ; no. 221.
Document (Susitna Hydroelectric Project) ; no. 1436.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • A. Generic plan formulation and selection methodology
  • B. Thermal generating resources
  • C. Alternative hydro generating sources
  • D. Engineering layout design assumptions
  • E. Susitna Basin screening model
  • F. Single and multi-reservoir hydropower simulation studies
  • G. Systemwide economic evaluation
  • H. Engineering studies
  • I. Environmental studies
  • J. Agency and other comments.