Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through J /
Saved in:
Physical Description: | 272 pages in various pagings : illustrations, maps ; 29 cm. |
---|---|
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "December 1981." This document is intended as the appendices to the final version of the main report "Task 6, Development selection. Subtask 6.05, Development selection report," which was also issued in December 1981. This set of appendices was originally issued in draft form in July 1981 without Appendix J. Appendix I includes two reports by Terrestrial Environmental Specialists, Inc. for Acres American Inc. with a three-page introduction. The reports are: Preliminary environmental assessment of tunnel alternatives. (December 15, 1980). (8, [13] pages including pages revised since its inclusion in the June 1981 edition) -- Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin. (January 16, 1981). (11, [12] pages). Also issued separately as APA 1325. |
Supplement of: | Task 6, Development selection. Subtask 6.05, Development selection report. [Final]. [Anchorage, Alaska] : Alaska Power Authority, [1981] |
Related Titles: | Revision of: Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through I. [July 1981 edition]. Buffalo, N.Y. : Acres American Inc., [1981] |
Original Source: | Preliminary environmental assessment of tunnel alternatives. [Version with December 1981 updated plans and table] Environmental considerations of alternative hydroelectric development schemes for the upper Susitna basin. |
Bibliography: | Includes bibliographical references. |