Subtask 7.10, Aquatic Studies procedures manual. Phase I. Final draft /
To insure adequate information is available to determine the impacts of the proposed hydroelectric project and to design proper mitigative strategies, a two-phase data collection program has been developed. This manual addresses Phase I (July 1, 1980-December 31, 1981) procedures to be conducted wit...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Subtask 7.10, Aquatic studies procedures manual. Phase I. Final draft Aquatic studies procedures manual. Phase I. Final draft Phase I, Final draft |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Acres American Incorporated. Susitna Hydroelectric Project. Alaska Power Authority. |
Publisher: | Alaska Dept. of Fish and Game, Susitna Hydro Aquatic Studies, |
Report Numbers: | APA 3505 APA 3554 APA 3555 RTS 6 RTS 6a RTS 6b |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3505. Document (Susitna Hydroelectric Project) ; no. 3554-3555. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04109cam a2200709Ia 4500 | ||
---|---|---|---|
001 | 373312 | ||
003 | SIRSI | ||
005 | 20160505125051.0 | ||
007 | ta | ||
007 | he bmu---bbca | ||
007 | cr bn||||a|||| | ||
008 | 030529s1982 akuab bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCQ |d RLA |d OCLCQ |d RLA | ||
035 | |a (OCoLC)52338921 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A68 no. 3554-3555 | |
088 | |a APA 3505 | ||
088 | |a APA 3554 | ||
088 | |a APA 3555 | ||
088 | |a RTS 6 | ||
088 | |a RTS 6a | ||
088 | |a RTS 6b | ||
049 | |a RLAA | ||
110 | 1 | |a Alaska. |b Susitna Hydro Aquatic Studies. | |
245 | 1 | 0 | |a Subtask 7.10, Aquatic Studies procedures manual. |n Phase I. |p Final draft / |c by Alaska Department of Fish and Game, Susitna Hydro Aquatic Studies ; for Acres American Incorporated. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Subtask 7.10, |p Aquatic studies procedures manual. |n Phase I. |p Final draft | |
246 | 3 | 0 | |a Aquatic studies procedures manual. |n Phase I. |p Final draft |
246 | 3 | 0 | |a Phase I, Final draft |
250 | |a Final draft. | ||
260 | |a Anchorage, Alaska : |b Alaska Dept. of Fish and Game, Susitna Hydro Aquatic Studies, |c [1982] | ||
300 | |a 2 volumes : |b illustrations, maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a "9/25/82"--Header. | ||
510 | 3 | |a Assigned APA Document numbers 3554 and 3555 in Susitna Hydroelectric Project document index. First volume is also assigned no. 3505, but is erroneously dated Sept. 25, 1985 in the index. | |
510 | 3 | |a Assigned RTS document no. 6a and 6b in the ADF&G Susitna River Aquatic Studies bibliography. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a To insure adequate information is available to determine the impacts of the proposed hydroelectric project and to design proper mitigative strategies, a two-phase data collection program has been developed. This manual addresses Phase I (July 1, 1980-December 31, 1981) procedures to be conducted within those study areas. | ||
505 | 0 | |a [Main report]. (APA 3505 or 3554 ; RTS 6a) -- Appendices I -- VIII. (APA 3555 ; RTS 6b). | |
505 | 8 | |a Detailed contents of main report: Introduction -- Technical procedures: Adult Anadromous Fisheries Studies ; Resident and Juvenile Anadromous Fisheries Studies ; Aquatic Habitat and Instream Flow Studies -- Data procedures: Adult Anadromous Fisheries Studies ; Resident and Juvenile Anadromous Fisheries Studies ; Aquatic Habitat and Instream Flow Studies -- Quality control -- Schedule -- Personnel. | |
505 | 8 | |a Detailed contents of appendices: Appendices I -- VIII: Sonar installation and operation manual ; Oscilloscope operation ; Fishwheel operation ; Fish tagging ; Electro-shocking instructions ; Habitat site locations ; RJ sampling techniques ; AH instruction manuals. | |
504 | |a Includes bibliographical references. | ||
610 | 1 | 0 | |a Alaska. |b Susitna Hydro Aquatic Studies. |
650 | 0 | |a Anadromous fishes |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Aquatic habitats |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Fish populations |x Research |z Alaska |z Susitna River. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3505. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3554-3555. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/35/APA3554.pdf |x This URL for the main report is needed for the image to display in the OPAC. |3 Direct link to the main report. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/35/APA3554.html |3 List of all volumes. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a RTS 00006 | ||
098 | |a APA 03505 | ||
098 | |a APA 03554 | ||
098 | |a APA 03555 | ||
098 | |a RTS 00006b | ||
098 | |a RTS 00006a |