Subtask 7.10, Aquatic Studies procedures manual. Phase I. Final draft /
To insure adequate information is available to determine the impacts of the proposed hydroelectric project and to design proper mitigative strategies, a two-phase data collection program has been developed. This manual addresses Phase I (July 1, 1980-December 31, 1981) procedures to be conducted wit...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Subtask 7.10, Aquatic studies procedures manual. Phase I. Final draft Aquatic studies procedures manual. Phase I. Final draft Phase I, Final draft |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Acres American Incorporated. Susitna Hydroelectric Project. Alaska Power Authority. |
Publisher: | Alaska Dept. of Fish and Game, Susitna Hydro Aquatic Studies, |
Report Numbers: | APA 3505 APA 3554 APA 3555 RTS 6 RTS 6a RTS 6b |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3505. Document (Susitna Hydroelectric Project) ; no. 3554-3555. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | To insure adequate information is available to determine the impacts of the proposed hydroelectric project and to design proper mitigative strategies, a two-phase data collection program has been developed. This manual addresses Phase I (July 1, 1980-December 31, 1981) procedures to be conducted within those study areas. |
---|---|
Physical Description: | 2 volumes : illustrations, maps ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "9/25/82"--Header. |
Bibliography: | Includes bibliographical references. |