Peace River 1981/82 ice observation report /
This report contains the first draft of the sections of the "Alberta - B.C. joint task force on Peace River ice" report which includes information on the events which occured at freeze-up at Peace River Town in Alberta, Canada in January, 1982; basement flooding in the West Peace River sub...
Saved in:
Main Author: | |
---|---|
Additional Author(s): | Quazi, M. E. |
Corporate Contributor(s): | Alberta. Water Resources Management Services. Technical Services Division, HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Alberta Environment, Water Resources Management Services, Technical Services Division, |
Report Numbers: | APA 1098 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1098. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This report contains the first draft of the sections of the "Alberta - B.C. joint task force on Peace River ice" report which includes information on the events which occured at freeze-up at Peace River Town in Alberta, Canada in January, 1982; basement flooding in the West Peace River subdivision; breakup preparation; observations of the River Engineering Branch field staff of the breakup of the Heart, Smoky and Peace rivers and a proposal for a controlled mode of operation of B.C. Hydro's G.M. Shrum generating station at the WAC Bennett Dam during freeze-up at Peace River Town. |
---|---|
Physical Description: | iii, 44, [13] pages : illustrations ; 28 cm |
Notes: | At head of title: Portions of the "Alberta - B.C. Joint Task Force on Peace River Ice - Report" prepared by Alberta Environment. "November 1982." |
Bibliography: | Includes bibliographical references (page 44). |