Peace River 1981/82 ice observation report /

This report contains the first draft of the sections of the "Alberta - B.C. joint task force on Peace River ice" report which includes information on the events which occured at freeze-up at Peace River Town in Alberta, Canada in January, 1982; basement flooding in the West Peace River sub...

Full description

Saved in:
Bibliographic Details
Main Author: Fonstad, G. D.,
Additional Author(s):Quazi, M. E.
Corporate Contributor(s):Alberta. Water Resources Management Services. Technical Services Division,

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alberta Environment, Water Resources Management Services, Technical Services Division,
Report Numbers:APA 1098
Series:Document (Susitna Hydroelectric Project) ; no. 1098.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This report contains the first draft of the sections of the "Alberta - B.C. joint task force on Peace River ice" report which includes information on the events which occured at freeze-up at Peace River Town in Alberta, Canada in January, 1982; basement flooding in the West Peace River subdivision; breakup preparation; observations of the River Engineering Branch field staff of the breakup of the Heart, Smoky and Peace rivers and a proposal for a controlled mode of operation of B.C. Hydro's G.M. Shrum generating station at the WAC Bennett Dam during freeze-up at Peace River Town.
Physical Description:iii, 44, [13] pages : illustrations ; 28 cm
Notes:At head of title: Portions of the "Alberta - B.C. Joint Task Force on Peace River Ice - Report" prepared by Alberta Environment.

"November 1982."
Bibliography:Includes bibliographical references (page 44).