Peace River 1981/82 ice observation report /

This report contains the first draft of the sections of the "Alberta - B.C. joint task force on Peace River ice" report which includes information on the events which occured at freeze-up at Peace River Town in Alberta, Canada in January, 1982; basement flooding in the West Peace River sub...

Full description

Saved in:
Bibliographic Details
Main Author: Fonstad, G. D.,
Additional Author(s):Quazi, M. E.
Corporate Contributor(s):Alberta. Water Resources Management Services. Technical Services Division,

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alberta Environment, Water Resources Management Services, Technical Services Division,
Report Numbers:APA 1098
Series:Document (Susitna Hydroelectric Project) ; no. 1098.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02716cam a2200445Ia 4500
001 2942093
003 SIRSI
005 20161027122401.0
007 ta
007 cr bn||a||||||
008 060715s1982 abca bt s000 0 eng d
040 |a AGLGW  |b eng  |c AGLGW  |d OCLCQ  |d OCLCO  |d OCLCF  |d RLA 
035 |a (OCoLC)70369571 
043 |a n-cn-ab 
050 4 |a TK1425.S8  |b A23 no. 1098 
050 4 |a GB1398.5.C2  |b F66 1982 
088 |a APA 1098 
100 1 |a Fonstad, G. D.,  |e author. 
245 1 0 |a Peace River 1981/82 ice observation report /  |c prepared by G.D. Fonstad ; submitted by M.E. Quazi. 
260 |a [Edmonton] :  |b Alberta Environment, Water Resources Management Services, Technical Services Division,  |c [1982] 
300 |a iii, 44, [13] pages :  |b illustrations ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Portions of the "Alberta - B.C. Joint Task Force on Peace River Ice - Report" prepared by Alberta Environment. 
500 |a "November 1982." 
510 3 |a Assigned APA Document no. 1098 in the Susitna Hydroelectric Project document index. This report was used as supporting documentation for research by the Susitna Hydroelectric Project. Series statement on verso of title page of those copies: HARZA-EBASCO Susitna Joint Venture document ; no. 1098. 
520 |a This report contains the first draft of the sections of the "Alberta - B.C. joint task force on Peace River ice" report which includes information on the events which occured at freeze-up at Peace River Town in Alberta, Canada in January, 1982; basement flooding in the West Peace River subdivision; breakup preparation; observations of the River Engineering Branch field staff of the breakup of the Heart, Smoky and Peace rivers and a proposal for a controlled mode of operation of B.C. Hydro's G.M. Shrum generating station at the WAC Bennett Dam during freeze-up at Peace River Town. 
530 |a Available also in electronic format on the Internet. 
504 |a Includes bibliographical references (page 44). 
650 0 |a Ice on rivers, lakes, etc.  |z Alberta  |z Peace River. 
650 7 |a Ice on rivers, lakes, etc.  |2 fast  |0 (OCoLC)fst00966601 
651 7 |a Alberta  |z Peace River.  |2 fast  |0 (OCoLC)fst01205269 
700 1 |a Quazi, M. E. 
710 1 |a Alberta.  |b Water Resources Management Services.  |b Technical Services Division,  |e issuing body. 
710 2 |a HARZA-EBASCO Susitna Joint Venture.  |5 AkARLIS 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1098.  |5 AkARLIS 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/10/APA1098.pdf  |z ARLIS Document Server 
901 |a ARLIS  |c ak 201610 
596 |a 9 10