Susitna Hydroelectric Project. Plan of study. Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection /
Several road and rail access corridors to the proposed Susitna River dams sites are evaluated in terms of design speed, grade, curvature, and design loading.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Access roads. Interim report #1, alternative access corridor selection Plan of study. Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection Interim report #1, alternative access corridor selection Alternative access corridor selection |
---|---|
Corporate Contributor(s): | R & M Consultants, Acres American Incorporated, Alaska Power Authority, HARZA-EBASCO Susitna Joint Venture. |
Publisher: | R & M Consultants, Inc., |
Report Numbers: | APA 12 APA 299 APA 1209 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 12. Document (Susitna Hydroelectric Project) ; no. 299. Document (Susitna Hydroelectric Project) ; no. 1209. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03110cam a2200637Ia 4500 | ||
---|---|---|---|
001 | 2669883 | ||
003 | SIRSI | ||
005 | 20160519095250.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 120203s1980 akub t 000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d RLA |d OCLCF |d OCLCO |d OCL |d OCLCQ |d RLA |d OCLCO |d RLA | ||
035 | |a (OCoLC)775007443 | ||
050 | 4 | |a TK1425.S8 |b A23 no. 12 | |
043 | |a n-us-ak | ||
088 | |a APA 12 | ||
088 | |a APA 299 | ||
088 | |a APA 1209 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Susitna Hydroelectric Project. |p Plan of study. |n Task 2, |p Access roads. |n Subtask 2.10, |p Interim report #1, alternative access corridor selection / |c prepared by R & M Consultants, Inc. |
246 | 1 | 6 | |a Susitna Hydroelectric Project. |p Access roads. |p Interim report #1, alternative access corridor selection |
246 | 3 | 0 | |a Plan of study. |n Task 2, |p Access roads. |n Subtask 2.10, |p Interim report #1, alternative access corridor selection |
246 | 3 | 0 | |a Task 2, |p Access roads. |n Subtask 2.10, |p Interim report #1, alternative access corridor selection |
246 | 3 | 0 | |a Access roads. |n Subtask 2.10, |p Interim report #1, alternative access corridor selection |
246 | 3 | 0 | |a Interim report #1, alternative access corridor selection |
246 | 3 | 0 | |a Alternative access corridor selection |
260 | |a [Alaska] : |b R & M Consultants, Inc., |c [1980] | ||
300 | |a 65 pages in various pagings : |b maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 12 | |
513 | |a Interim report. | ||
500 | |a "Prepared for Alaska Power Authority and Acres American, Incorporated." | ||
500 | |a "December 1980." | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document no. 12 in Susitna Hydroelectric Project document index. Also assigned numbers 299 and 1209 (duplicate entries). | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Several road and rail access corridors to the proposed Susitna River dams sites are evaluated in terms of design speed, grade, curvature, and design loading. | ||
710 | 2 | |a R & M Consultants, |e author, |e issuing body. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 4 | |a Dams |x Access roads |z Alaska |z Susitna River Region. | |
650 | 4 | |a Access roads |z Alaska |z Susitna River Region. | |
650 | 0 | |a Highway planning |z Alaska |z Susitna River Region. | |
650 | 0 | |a Transportation |z Alaska |z Susitna River Region |x Planning. | |
710 | 2 | |a Acres American Incorporated, |e sponsoring body. | |
710 | 2 | |a Alaska Power Authority, |e sponsoring body. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. |5 AkARLIS | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 12. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 299. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1209. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA12.pdf |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a APA 00012 | ||
098 | |a APA 00299 | ||
098 | |a APA 01209 |