Susitna Hydroelectric Project. Plan of study. Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection /
Several road and rail access corridors to the proposed Susitna River dams sites are evaluated in terms of design speed, grade, curvature, and design loading.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Access roads. Interim report #1, alternative access corridor selection Plan of study. Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection Interim report #1, alternative access corridor selection Alternative access corridor selection |
---|---|
Corporate Contributor(s): | R & M Consultants, Acres American Incorporated, Alaska Power Authority, HARZA-EBASCO Susitna Joint Venture. |
Publisher: | R & M Consultants, Inc., |
Report Numbers: | APA 12 APA 299 APA 1209 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 12. Document (Susitna Hydroelectric Project) ; no. 299. Document (Susitna Hydroelectric Project) ; no. 1209. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Several road and rail access corridors to the proposed Susitna River dams sites are evaluated in terms of design speed, grade, curvature, and design loading. |
---|---|
Physical Description: | 65 pages in various pagings : maps ; 28 cm. |
Notes: | "Prepared for Alaska Power Authority and Acres American, Incorporated." "December 1980." Series statement from label on cover. |
Report Type: | Interim report. |