Susitna Hydroelectric Project. Plan of study. Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection /

Several road and rail access corridors to the proposed Susitna River dams sites are evaluated in terms of design speed, grade, curvature, and design loading.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Access roads. Interim report #1, alternative access corridor selection

Plan of study. Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection

Task 2, Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection

Access roads. Subtask 2.10, Interim report #1, alternative access corridor selection

Interim report #1, alternative access corridor selection

Alternative access corridor selection
Corporate Contributor(s):R & M Consultants,

Acres American Incorporated,

Alaska Power Authority,

HARZA-EBASCO Susitna Joint Venture.
Publisher:R & M Consultants, Inc.,
Report Numbers:APA 12

APA 299

APA 1209
Series:Document (Susitna Hydroelectric Project) ; no. 12.
Document (Susitna Hydroelectric Project) ; no. 299.
Document (Susitna Hydroelectric Project) ; no. 1209.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Several road and rail access corridors to the proposed Susitna River dams sites are evaluated in terms of design speed, grade, curvature, and design loading.
Physical Description:65 pages in various pagings : maps ; 28 cm.
Notes:"Prepared for Alaska Power Authority and Acres American, Incorporated."

"December 1980."

Series statement from label on cover.
Report Type:Interim report.