Susitna-Watana Hydroelectric Project engineering feasibility report /

This engineering feasibility report for the Susitna-Watana Hydroelectric Project has been prepared to support the licensing process. It provides the basis for required license application exhibits, most notably the Supporting Design Report, Exhibit F, which must be filed concurrently with the FERC l...

Full description

Saved in:
Bibliographic Details
Alternate Title:Engineering feasibility report
Corporate Contributor(s):MWH Americas, Inc.

Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 280

SuWa 281

SuWa 282

SuWa 283

SuWa 284

14-21-REP v0.0

13-1421-REP-073114
Funding Numbers:This study was conducted under AEA contract no.
Series:Susitna-Watana Hydroelectric Project document ; no. 280-284.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 07200cam a2200865Ia 4500
001 2631116
003 SIRSI
005 20150902205623.0
007 ta
007 cr cn||a||||||
008 150831s2014 akuabf bt s000 0 eng d
040 |a RLA  |c RLA  |d RLA  |d OCLCO  |d RLA 
035 |a (OCoLC)919475052 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 280-284 
088 |a SuWa 280 
088 |a SuWa 281 
088 |a SuWa 282 
088 |a SuWa 283 
088 |a SuWa 284 
088 |a 14-21-REP v0.0 
088 |a 13-1421-REP-073114 
245 0 0 |a Susitna-Watana Hydroelectric Project engineering feasibility report /  |c prepared for Alaska Energy Authority ; prepared by MWH Americas, Inc. 
246 3 0 |a Engineering feasibility report 
260 |a Anchorage, AK :  |b Alaska Energy Authority,  |c [2014] 
300 |a 2303 p. in various paginations :  |b col. ill., col. maps ;  |c 28 cm. and 28 x 43 cm. +  |e 3 plates (42 x 23 cm. and 42 x 42 cm.). 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 280-284 
500 |a "Susitna-Watana Hydro." 
500 |a "13-1421-REP-073114." 
500 |a "Report 14-21-REP v0.0." 
500 |a "AEA11-022." 
500 |a "December 2014." 
500 |a Three appendices were not released. "Appendix A : Drawings" (listed on pages xxvii to xxxii in the table of contents) is not available. Appendices B1 and B7 are not available; a placeholder page was issued for B1. A flash drive containing a visualization of all 3-D models accompanies the report and is called "Visualization Susitna-Watana Animation Draft" (see page 25 of Section 1). This flash drive was not received issued publicly. 
500 |a Three of the maps in Appendix B03 are oversized plates (Plates A-BP, A-CWM, and A-CME). 
536 |a This study was conducted under AEA contract no.  |b AEA11-022 
500 |a ARLIS assigned report numbers: SuWa 280-284. (280: main report -- 281: Appendices B1-B3 (except figures for B3) -- 282: Figures for Appendix B3 -- 283: Appendix B4 -- 284: Appendices B5-B12). 
510 3 |a Listed in May 2015 (then removed June 2015) on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Engineering feasibility report. 
513 |a Engineering feasibility report. 
506 1 |a "Significant parts of this report are subject to FERC CEII regulations and should not be disclosed."--Title page;  |c No restrictions to access at this time. 
504 |a Includes bibliographical references (pages 17-1 to 17-8). 
500 |a "The content of this report is governed by confidentiality clauses in the contract between MWH and AEA. The contents of this document may not be disclosed to other parties in a manner not consistent with the terms of the confidentiality clauses of that contract. Some information contained herein is subject to FERC Critical Energy Infrastructure Information (CEII) Regulations and required non-disclosure documentation."--Preface. 
530 |a Available also in electronic format on the Internet. 
520 |a This engineering feasibility report for the Susitna-Watana Hydroelectric Project has been prepared to support the licensing process. It provides the basis for required license application exhibits, most notably the Supporting Design Report, Exhibit F, which must be filed concurrently with the FERC license application. This report incorporates results of studies conducted between February 2011 and December 2014. 
505 8 0 |g Independent reports included as appendices are:  |g Appendix B2.  |t Seismic hazard characterization and ground motion analyses for the Susitna-Watana Dam site area /  |r prepared by Fugro Consultants, Inc. for MWH.  |g (NTP 6 Seismic studies) (Technical memorandum ; no. 4) --  |g Appendix B3.  |t Susitna-Watana Hydroelectric Project interim crustal seismic source evaluation /  |r prepared by Fugro Consultants, Inc. for MWH.  |g (Technical memorandum) --  |g Appendix B4.  |t Susitna-Watana Hydroelectric Project probable maximum flood study /  |r prepared by MWH --  |g Appendix B8.  |t Seismic analysis of a section of Watana Dam /  |r prepared by MWH --  |g Appendix B9.  |t MWH Watana transmission study pre-Watana analysis /  |r David A. Meyer, James W. Cote Jr., David W. Burlingame ;  |t Watana Hydro transmission corridor report /  |r prepared by David Burlingame, Delbert LaRue --  |g Appendix B12.  |t Preliminary design criteria, 2014 /  |r prepared by MWH Americas, Inc.  |g Updated draft. (NTP 13) (Technical memorandum ; no. 4). 
505 8 0 |g Appendix B4 has appendices (Appendix B follows Appendix D): Appendix A.  |t Susitna-Watana Hydroelectric Project probable maximum flood study /  |r prepared by Applied Weather Associates, LLC for MWH --  |g Appendix C.  |t Susitna-Watana Hydroelectric Project site-specific probable maximum precipitation study, Appendix C: Short list storm analyses /  |r prepared by Applied Weather Associates, LLC for MWH --  |g Appendix D.  |t Storm Precipitation Analysis System (SPAS) program description --  |g Appendix B.  |t Susitna-Watana Hydroelectric Project intermediate flood routing /  |r prepared by MWH.  |g (Technical memorandum ; 14-08-TM). 
590 |a ARLIS: In the volume of figures for Appendix B3 (numbered SuWa 282), three figures were printed on regular oversized pages (11 x 17 inches). For full resolution, see the PDF file. The figures are plates A-BP, A-CWM, and A-CME. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction. 
740 0 2 |a Seismic hazard characterization and ground motion analyses for the Susitna-Watana Dam site area. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction. 
651 0 |a Susitna River (Alaska)  |x Power utilization. 
710 2 |a MWH Americas, Inc. 
710 2 |a Alaska Energy Authority. 
710 2 |a Susitna-Watana Hydroelectric Project. 
740 0 2 |a Susitna-Watana Hydroelectric Project interim crustal seismic source evaluation. 
740 0 2 |a Susitna-Watana Hydroelectric Project probable maximum flood study. 
740 0 2 |a Seismic analysis of a section of Watana Dam. 
740 0 2 |a MWH Watana transmission study pre-Watana analysis. 
740 0 2 |a Watana Hydro transmission corridor report. 
740 0 2 |a Preliminary design criteria, 2014. 
740 0 2 |a Susitna-Watana Hydroelectric Project intermediate flood routing. 
740 0 2 |a Storm Precipitation Analysis System (SPAS) program description. 
740 0 2 |a Short list storm analyses. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 280-284. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa280/SuWa280title.pdf  |x This URL for the first volume is needed for image to display in the OPAC.  |3 Direct link to the first part (title page, table of contents, abbreviations).  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa280/SuWa280.html  |3 List of all parts of this document.  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00280 
098 |a SuWa 00281 
098 |a SuWa 00282 
098 |a SuWa 00283 
098 |a SuWa 00284