Feasibility level estimate.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Feasibility level estimate Susitna Project. Feasibility level estimate |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Harza-Ebasco Susitna Joint Venture, |
Report Numbers: | APA 2541 APA 2542 APA 2543 APA 2544 APA 2545 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2541-2545. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | 5 volumes : illustrations ; 28 cm. |
---|---|
Notes: | Chiefly tables. At head of title of v. 1: Susitna Hydroelectric Project. At head of title of v. 2-5: Susitna Project. "July 1984"--Volume 1. "March 1984"--Volumes 2-5. Series statement from label on cover. |