Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work /

"This report presents the work undertaken by Acres American Inc. (Acres) and its sub-contractor Woodward-Clyde Consultants (WCC) in Subtask 1.01, Review of ISER Work Plan and Methodologies. The report contains a review of ISER's projections of electricity power consumption for the Railbelt...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work

Power studies. Subtask 1.01, Closeout report. Review of ISER work

Subtask 1.01. Closeout report. Review of ISER work

Closeout report. Review of ISER work

Review of ISER work
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Acres American Inc.,
Report Numbers:APA 1201

SUS 29
Series:Document (Susitna Hydroelectric Project) ; no. 1201.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • appendix A.
  • Review of ISER forecasting model
  • appendix B.
  • Critique of ISER report /
  • by Alaska Pacific Bank
  • appendix C.
  • Critiques of ISER reports /
  • by Woodward Clyde Consultants
  • appendix D.
  • Critique of ISER report /
  • by Energy Probe
  • appendix E.
  • Critiques of ISER and Tussing reports by Alaska utility managers /
  • Golden Valley Electric Association, Alaska Rural Electric Cooperative Association, Anchorage Municipal Light & Power
  • appendix F.
  • Issues raised during energy requirements forecast workshops.