Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work /
"This report presents the work undertaken by Acres American Inc. (Acres) and its sub-contractor Woodward-Clyde Consultants (WCC) in Subtask 1.01, Review of ISER Work Plan and Methodologies. The report contains a review of ISER's projections of electricity power consumption for the Railbelt...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work Power studies. Subtask 1.01, Closeout report. Review of ISER work Subtask 1.01. Closeout report. Review of ISER work Closeout report. Review of ISER work Review of ISER work |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Acres American Inc., |
Report Numbers: | APA 1201 SUS 29 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1201. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- appendix A.
- Review of ISER forecasting model
- appendix B.
- Critique of ISER report /
- by Alaska Pacific Bank
- appendix C.
- Critiques of ISER reports /
- by Woodward Clyde Consultants
- appendix D.
- Critique of ISER report /
- by Energy Probe
- appendix E.
- Critiques of ISER and Tussing reports by Alaska utility managers /
- Golden Valley Electric Association, Alaska Rural Electric Cooperative Association, Anchorage Municipal Light & Power
- appendix F.
- Issues raised during energy requirements forecast workshops.