Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work /

"This report presents the work undertaken by Acres American Inc. (Acres) and its sub-contractor Woodward-Clyde Consultants (WCC) in Subtask 1.01, Review of ISER Work Plan and Methodologies. The report contains a review of ISER's projections of electricity power consumption for the Railbelt...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 1, Power studies. Subtask 1.01, Closeout report. Review of ISER work

Power studies. Subtask 1.01, Closeout report. Review of ISER work

Subtask 1.01. Closeout report. Review of ISER work

Closeout report. Review of ISER work

Review of ISER work
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Acres American Inc.,
Report Numbers:APA 1201

SUS 29
Series:Document (Susitna Hydroelectric Project) ; no. 1201.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03173cam a2200553Ia 4500
001 252433
003 SIRSI
005 20120320125859.0
007 he bm||||b|c|
007 cr bn||||a||||
008 030623s1980 nyua bt s000 0 eng d
019 |a 42994113 
035 |a (OCoLC)52483570  |z (OCoLC)42994113 
040 |a RLA  |c RLA  |d OCLCQ  |d RLA 
049 |a RLAA 
088 |a APA 1201 
088 |a SUS 29 
090 |a TK1425.S8  |b A23 no. 1201 
245 0 0 |a Task 1, Power studies.  |n Subtask 1.01,  |p Closeout report.  |p Review of ISER work /  |c Acres American Incorporated. 
246 1 6 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 1,  |p Power studies.  |n Subtask 1.01,  |p Closeout report.  |p Review of ISER work 
246 3 0 |a Power studies.  |n Subtask 1.01,  |p Closeout report.  |p Review of ISER work 
246 3 0 |a Subtask 1.01.  |p Closeout report.  |p Review of ISER work 
246 3 0 |a Closeout report.  |p Review of ISER work 
246 3 0 |a Review of ISER work 
260 |a [Buffalo] :  |b Acres American Inc.,  |c [1980] 
300 |a 282 p. in various pagings :  |b ill. ;  |c 28 cm. 
490 1 |a [Document ;  |v no. 1201] 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "December, 1980." 
510 3 |a Assigned APA Document no. 1201 in the Susitna Hydroelectric Project document index. 
510 3 |a Assigned SUS document no. 29 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "This report presents the work undertaken by Acres American Inc. (Acres) and its sub-contractor Woodward-Clyde Consultants (WCC) in Subtask 1.01, Review of ISER Work Plan and Methodologies. The report contains a review of ISER's projections of electricity power consumption for the Railbelt and addresses specific issues related to the methodology."--P. 1-1. 
505 2 0 |g appendix A.  |t Review of ISER forecasting model --  |g appendix B.  |t Critique of ISER report /  |r by Alaska Pacific Bank --  |g appendix C.  |t Critiques of ISER reports /  |r by Woodward Clyde Consultants --  |g appendix D.  |t Critique of ISER report /  |r by Energy Probe --  |g appendix E.  |t Critiques of ISER and Tussing reports by Alaska utility managers /  |r Golden Valley Electric Association, Alaska Rural Electric Cooperative Association, Anchorage Municipal Light & Power --  |g appendix F.  |t Issues raised during energy requirements forecast workshops. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River Valley. 
650 0 |a Electrification  |z Alaska. 
651 0 |a Susitna River (Alaska)  |x Power utilization. 
710 2 |a Acres American Incorporated. 
043 |a n-us-ak 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1201. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1201.pdf  |z ARLIS Document Server 
901 |a 3755  |c TK1425.S8A23 no.1201 
901 |a 0104  |c TK1424.A4S98 no.1 One copy on REF ALASKA also. 
596 |a 9 10 11 
098 |a SUS 00029 