Susitna River fish distribution and abundance implementation plan, Appendix 3, Protocol for site-specific gear type selection; version 5 /

This protocol is for use by field crews when selecting appropriate gear types in order to facilitate standardized and repeatable sampling methods among different crews, in varying habitats, and across seasons. These crews will be describing the current fish assemblage (including spatial and temporal...

Full description

Saved in:
Bibliographic Details
Alternate Title:Appendix 3 : Gear type selection protocol, fish distribution and abundance implementation plan
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

R2 Resource Consultants.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 263
Series:Susitna-Watana Hydroelectric Project document ; no. 263.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04003nam a2200541Ia 4500
001 2431218
003 SIRSI
005 20150608012210.0
007 ta
007 cr cn||||a||||
008 150608s2014 akua bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)910851447 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 263 
088 |a SuWa 263 
049 |a RLAA 
245 0 0 |a Susitna River fish distribution and abundance implementation plan, Appendix 3, Protocol for site-specific gear type selection; version 5 /  |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. 
246 1 7 |a Appendix 3 : Gear type selection protocol, fish distribution and abundance implementation plan 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2014] 
300 |a ii, 19 p. :  |b ill. (some col.) ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 263 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "November 2014." 
500 |a ARLIS assigned report number: SuWa 263. 
510 3 |a Listed in November 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 14, 2014 technical memorandum filings. 
513 |a November 14, 2014 technical memorandum filings. 
513 |a Technical memorandum. 
520 |a This protocol is for use by field crews when selecting appropriate gear types in order to facilitate standardized and repeatable sampling methods among different crews, in varying habitats, and across seasons. These crews will be describing the current fish assemblage (including spatial and temporal distribution) and relative abundance by species and life stage in the Susitna River. This version (version 5) of the protocol is to be used in the 2015 field season for the Susitna-Watana Hydroelectric Project studies. 
500 |a This document was filed to FERC as Attachment I to: Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. (SuWa 254). 
530 |a Available also in electronic format on the Internet. 
500 |a The first version of this protocol appeared as Appendix 3 in "Susitna River fish distribution and abundance implementation plan" submitted March 1, 2013 (SuWa 17). It had been revised several times, previously as Appendix 3 in the report by the same title within the Final Study Plan (SuWa 200, Section 9.6A). Version 5 is described in this cataloging record. 
505 0 |a Introduction -- Gear type selection approach -- Level of sampling effort -- Microhabitat diversity -- Tables -- Figures. 
504 |a Includes bibliographical references (p. 4-5). 
650 0 |a Fisheries  |z Alaska  |z Susitna River  |x Equipment and supplies. 
650 0 |a Fishes  |x Counting  |z Alaska  |z Susitna River  |x Technique. 
710 2 |a Alaska Energy Authority. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a R2 Resource Consultants. 
787 0 8 |i Originally submitted as Attachment I to:  |a Dyok, Wayne.  |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings.  |d [Anchorage : Alaska Energy Authority, 2014]  |k Susitna-Watana Hydroelectric Project document ; no. 254  |r SuWa 254  |w (OCoLC)910851283 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 263. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa263.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa254.html  |3 List of all technical memorandums that were submitted as attachments to the cover letter filed to FERC on November 14, 2014 (SuWa 254-268).  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00263