Susitna River fish distribution and abundance implementation plan, Appendix 3, Protocol for site-specific gear type selection; version 5 /

This protocol is for use by field crews when selecting appropriate gear types in order to facilitate standardized and repeatable sampling methods among different crews, in varying habitats, and across seasons. These crews will be describing the current fish assemblage (including spatial and temporal...

Full description

Saved in:
Bibliographic Details
Alternate Title:Appendix 3 : Gear type selection protocol, fish distribution and abundance implementation plan
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

R2 Resource Consultants.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 263
Series:Susitna-Watana Hydroelectric Project document ; no. 263.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This protocol is for use by field crews when selecting appropriate gear types in order to facilitate standardized and repeatable sampling methods among different crews, in varying habitats, and across seasons. These crews will be describing the current fish assemblage (including spatial and temporal distribution) and relative abundance by species and life stage in the Susitna River. This version (version 5) of the protocol is to be used in the 2015 field season for the Susitna-Watana Hydroelectric Project studies.
Physical Description:ii, 19 p. : ill. (some col.) ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"November 2014."

ARLIS assigned report number: SuWa 263.

This document was filed to FERC as Attachment I to: Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. (SuWa 254).

The first version of this protocol appeared as Appendix 3 in "Susitna River fish distribution and abundance implementation plan" submitted March 1, 2013 (SuWa 17). It had been revised several times, previously as Appendix 3 in the report by the same title within the Final Study Plan (SuWa 200, Section 9.6A). Version 5 is described in this cataloging record.
Report Type:November 14, 2014 technical memorandum filings.

Technical memorandum.
Related Titles:Originally submitted as Attachment I to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 254 SuWa 254
Bibliography:Includes bibliographical references (p. 4-5).