Salmon escapement study (Study 9.7), 2014 implementation and preliminary results, technical memorandum /

This technical memorandum describes some of the methods, variances, and preliminary results of the 2014 salmon escapement study (Study 9.7 of the Susitna-Watana Hydroelectric Project). The methods, variances focus on the middle and upper rivers (primarily the Susitna River), and the preliminary resu...

Full description

Saved in:
Bibliographic Details
Alternate Title:Technical memorandum, 2014 salmon escapement implementation and preliminary results
Corporate Contributor(s):Alaska Energy Authority.

LGL Alaska Research Associates.

Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 252
Series:Susitna-Watana Hydroelectric Project document ; no. 252.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03900nam a2200541Ia 4500
001 2390062
003 SIRSI
005 20150427104921.0
007 ta
007 cr cn||||a||||
008 150427s2014 akubd bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)908038259 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 252 
088 |a SuWa 252 
049 |a RLAA 
245 0 0 |a Salmon escapement study (Study 9.7), 2014 implementation and preliminary results, technical memorandum /  |c prepared for Alaska Energy Authority ; prepared by LGL Alaska Research Associates, Inc. 
246 1 7 |a Technical memorandum, 2014 salmon escapement implementation and preliminary results 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2014] 
300 |a v, 43 p. :  |b col. maps, col. charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 252 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "September 2014." 
500 |a ARLIS assigned report number: SuWa 252. 
510 3 |a Listed in September 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: September 30, 2014 technical memorandum filings. 
513 |a September 30, 2014 technical memorandum filings. 
513 |a Technical memorandum. 
500 |a This document was filed to FERC as Attachment E to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Third set of 2014 technical memoranda for Initial Study Plan meetings. (SuWa 247). 
530 |a Available also in electronic format on the Internet. 
520 |a This technical memorandum describes some of the methods, variances, and preliminary results of the 2014 salmon escapement study (Study 9.7 of the Susitna-Watana Hydroelectric Project). The methods, variances focus on the middle and upper rivers (primarily the Susitna River), and the preliminary results focus on chinook salmon. The methods include capturing, tagging, and tracking adult salmon in the Susitna and Yentna rivers; determining migration behavior and spawning locations of radio-tagged fish in the Susitna River; characterizing adult salmon migration within and above Devils Canyon; documenting salmon spawning locations in turbid waters; comparing historical and current data on run timing, distribution, abundance, and spawning locations of salmon; counting chinook salmon spawning in the Susitna River and its tributaries; and collecting tissue samples for the fish genetics study. 
504 |a Includes bibliographical references (pages 14-15). 
650 0 |a Chinook salmon  |z Alaska  |z Susitna River. 
650 0 |a Chinook salmon  |x Counting  |z Alaska  |z Susitna River. 
650 0 |a Chinook salmon  |x Monitoring  |z Alaska  |z Susitna River. 
650 0 |a Escapement (Fisheries)  |z Alaska  |z Susitna River. 
710 2 |a Alaska Energy Authority. 
710 2 |a LGL Alaska Research Associates. 
710 2 |a Susitna-Watana Hydroelectric Project. 
787 0 8 |i Originally submitted as Attachment E to:  |a Dyok, Wayne.  |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; third set of 2014 technical memoranda for Initial Study Plan meetings.  |d [Anchorage : Alaska Energy Authority, 2014]  |k Susitna-Watana Hydroelectric Project document ; no. 239  |r SuWa 239  |w (OCoLC)908038049 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 252. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa252.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa247.html  |3 List of all technical memorandums that were submitted as attachments to the cover letter filed to FERC on September 30, 2014 (SuWa 247-253).  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00252