Site-specific seismic hazard study, Study plan Section 16.6, Initial Study Report /
The objectives of this study are to identify potential seismic hazards and conduct deterministic and probabilistic seismic hazard evaluation in order to estimate earthquake ground motion parameters at the Susitna-Watana Hydroelectric Project site and develop seismic design criteria for the Project....
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 16.6, Site-specific seismic hazard study. Initial Study Report. Site-specific seismic hazard study (16.6) Site-specific seismic hazard study plan Section 16.6, Study Completion Report. |
---|---|
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. MWH Americas, Inc., Fugro Consultants (Firm), Alaska Energy Authority, |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 223 |
Original Source: | Succeeded by (expression): Site-specific seismic hazard study plan Section 16.6, Study Completion Report. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 223. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The objectives of this study are to identify potential seismic hazards and conduct deterministic and probabilistic seismic hazard evaluation in order to estimate earthquake ground motion parameters at the Susitna-Watana Hydroelectric Project site and develop seismic design criteria for the Project. The study area encompasses subduction-related sources and Quaternary crustal seismic sources within a 62-mile radius of the Watana Dam site with a focus on the dam site and reservoir area. |
---|---|
Physical Description: | 35 pages in various pagings : color maps, color charts ; 28 cm. |
Notes: | "Susitna-Watana Hydroelectric Project (FERC No. 14241)." "Prepared for Alaska Energy Authority." Parts A, B, and C are dated: June 2014. Part D is dated: November 2015. ARLIS assigned report number: SuWa 223. |
Report Type: | Initial Study Report. |
Original Source: | Succeeded by (expression): Site-specific seismic hazard study plan Section 16.6, Study Completion Report. |
Bibliography: | Includes bibliographical references (Part A, page 8). |
Related Items: | Succeeded by: Site-specific seismic hazard study plan Section 16.6, Study Completion Report / prepared by MWH. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). |