River recreation flow and access study, Study plan Section 12.7, Initial Study Report /
This study is being conducted as one in a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. The objective of this study is to contribute data to the recreation resources study (Study 12.5) concerning the...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 12.7, River recreation flow and access study. Initial Study Report. River recreation flow and access study (12.7) River recreation flow and access study, Study plan Section 12.7, 2014 Study Implementation Report. |
---|---|
Corporate Contributor(s): | Alaska Energy Authority, Susitna-Watana Hydroelectric Project. Environmental Resources Management (Firm), |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 223 |
Original Source: | Succeeded by (expression): River recreation flow and access study, Study plan Section 12.7, 2014 Study Implementation Report. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 223. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04587cam a2200577Ia 4500 | ||
---|---|---|---|
001 | 2381713 | ||
003 | SIRSI | ||
005 | 20170126151355.0 | ||
007 | ta | ||
007 | cr cn||a|||||| | ||
008 | 150331m20142015akuabd bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCQ |d RLA | ||
035 | |a (OCoLC)905913216 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 223 sec. 12.7 | |
088 | |a SuWa 223 | ||
130 | 0 | |a Initial Study Report. |n Study plan Section 12.7, |p River recreation flow and access study. | |
245 | 1 | 0 | |a River recreation flow and access study, Study plan Section 12.7, Initial Study Report / |c prepared by ERM. |
246 | 1 | 7 | |a Initial Study Report. |p River recreation flow and access study (12.7) |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2014-2015] | ||
300 | |a 105 pages in various pagings : |b color illustrations, color maps, color charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 223 | |
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a "Prepared for Alaska Energy Authority." | ||
500 | |a Parts A, B, and C are dated: June 2014. | ||
500 | |a Part D is dated: November 2015. | ||
513 | |a Initial Study Report. | ||
500 | |a ARLIS assigned report number: SuWa 223. | ||
510 | 3 | |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. | |
580 | |a Succeeded by: River recreation flow and access study, Study plan Section 12.7, 2014 Study Implementation Report / prepared by AECOM/ERM. -- November 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This study is being conducted as one in a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. The objective of this study is to contribute data to the recreation resources study (Study 12.5) concerning the relationship between river flows and river recreation opportunities and uses on the Susitna River with a focus on how the Susitna-Watana Hydroelectric Project would effect such opportunities and uses. The study area (comprising the three selected river reaches) extends from the George Parks Highway Bridge (at river mile 83.3 near the Y road junction) up to the Denali Highway Susitna River Bridge (at river mile 291). The study documents the flows for a variety of motorized and non-motorized watercraft using the Susitna River for recreation and as a transportation corridor. Likewise, the study documents ice-dependent recreation and transportation activities during the winter. | ||
505 | 0 | |a Part A. Sections 1-6, 8-10 -- Appendix A. River recreation and access Internet survey -- Appendix B. River recreation executive interview questions -- Appendix C. Winter river recreation and transportation executive interview questions -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report. | |
504 | |a Includes bibliographical references (Part A: pages 17-18). | ||
650 | 0 | |a Rivers |x Recreational use |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Social aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Social aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Recreational surveys |z Alaska |z Susitna River. | |
650 | 0 | |a River surveys |z Alaska |z Susitna River. | |
710 | 2 | |a Alaska Energy Authority, |e issuing body, |e sponsoring body. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Environmental Resources Management (Firm), |e author. | |
730 | 0 | |i Succeeded by (expression): |a River recreation flow and access study, Study plan Section 12.7, 2014 Study Implementation Report. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 223. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec12-7ptA.pdf |x This URL for the first part of this report is needed for image to display in the OPAC. |3 Direct link to the first part. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html |3 List of all parts of this document (see Section 12.7). List includes related Initial Study Reports. |z ARLIS Document Server |
098 | |a SuWa 00223 | ||