Riparian instream flow study, Study plan Section 8.6, Initial Study Report /

Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sedimen...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 8.6, Riparian instream flow study, Study plan Section 8.6.

Initial Study Report. Riparian instream flow study (8.6)

Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report.
Corporate Contributor(s):R2 Resource Consultants,

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04235cam a2200565Ia 4500
001 2379776
003 SIRSI
005 20161215191655.0
007 ta
007 cr cn||a||||||
008 150320m20142015akuabd bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA 
035 |a (OCoLC)905370465 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 223 sec. 8.6 
088 |a SuWa 223 
130 0 |a Initial Study Report.  |n Study plan Section 8.6,  |p Riparian instream flow study, Study plan Section 8.6. 
245 1 0 |a Riparian instream flow study, Study plan Section 8.6, Initial Study Report /  |c prepared by R2 Resource Consultants. 
246 1 7 |a Initial Study Report.  |p Riparian instream flow study (8.6) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2014-2015] 
300 |a 168 pages in various pagings :  |b color illustrations, color maps, color charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a Parts A, B, and C are dated: June 2014. 
500 |a Part D is dated: November 2015. 
513 |a Initial Study Report. 
500 |a ARLIS assigned report number: SuWa 223. 
510 3 |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. 
580 |a Succeeded by: Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report / prepared by R2 Resource Consultants. -- November 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). 
530 |a Available also in electronic format on the Internet. 
520 |a Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sediment, and ice process regimes. This document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan and as modified by FERC's Study plan determination issued April 1, 2013 and in the 'Riparian instream flow, groundwater, and riparian vegetation studies FERC determination response technical memorandum filed July 1, 2013. 
505 0 |a Part A. Sections 1-6, 8-10 -- Appendix A. Riparian focus area selection: Response to agency comments regarding herbaceous vegetation / prepared by Aaron Wells, Kevin Fetherston, and Kate Knox -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report. 
504 |a Includes bibliographical references (Part A, pages 41-46). 
650 0 |a Riparian ecology  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Instream flow  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
710 2 |a R2 Resource Consultants,  |e author. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
730 0 |i Succeeded by (expression):  |a Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec8-6ptA.pdf  |x This URL for the first part of this report is needed for image to display in the OPAC.  |3 Direct link to the first part of this report.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html  |3 List of all parts of this document (see Section 8.6). List includes related Initial Study Reports.  |z ARLIS Document Server 
098 |a SuWa 00223 
596 |a 10