Riparian instream flow study, Study plan Section 8.6, Initial Study Report /

Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sedimen...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 8.6, Riparian instream flow study, Study plan Section 8.6.

Initial Study Report. Riparian instream flow study (8.6)

Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report.
Corporate Contributor(s):R2 Resource Consultants,

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sediment, and ice process regimes. This document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan and as modified by FERC's Study plan determination issued April 1, 2013 and in the 'Riparian instream flow, groundwater, and riparian vegetation studies FERC determination response technical memorandum filed July 1, 2013.
Physical Description:168 pages in various pagings : color illustrations, color maps, color charts ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.
Report Type:Initial Study Report.
Original Source:Succeeded by (expression): Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report.
Bibliography:Includes bibliographical references (Part A, pages 41-46).
Related Items:Succeeded by: Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report / prepared by R2 Resource Consultants. -- November 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).