Air quality study, Study plan Section 15.9, Initial Study Report /

The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 15.9, Air quality study. Draft.

Initial Study Report. Air quality study (15.9)
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

Harris, Miller, Miller & Hanson Inc.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 207
Edition:Draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 207.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term (operational) impacts. The study area includes not only the immediate Project area, but also the Railbelt region.
Physical Description:vi, 25 p. : col. maps, col. chart ; 28 cm.
Notes:"February 2014."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 207.
Report Type:Draft Initial Study Report.
Bibliography:Includes bibliographical references (p. 13).