Air quality study, Study plan Section 15.9, Initial Study Report /
The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 15.9, Air quality study. Draft. Initial Study Report. Air quality study (15.9) |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. Susitna-Watana Hydroelectric Project. Harris, Miller, Miller & Hanson Inc. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 207 |
Edition: | Draft. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 207. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term (operational) impacts. The study area includes not only the immediate Project area, but also the Railbelt region. |
---|---|
Physical Description: | vi, 25 p. : col. maps, col. chart ; 28 cm. |
Notes: | "February 2014." "Susitna-Watana Hydroelectric Project (FERC No. 14241)." ARLIS assigned report number: SuWa 207. |
Report Type: | Draft Initial Study Report. |
Bibliography: | Includes bibliographical references (p. 13). |