Air quality study, Study plan Section 15.9, Initial Study Report /
The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 15.9, Air quality study. Draft. Initial Study Report. Air quality study (15.9) |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. Susitna-Watana Hydroelectric Project. Harris, Miller, Miller & Hanson Inc. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 207 |
Edition: | Draft. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 207. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02708nam a2200541Ia 4500 | ||
---|---|---|---|
001 | 2375641 | ||
003 | SIRSI | ||
005 | 20150216070126.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 150216s2014 akubd bt s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)903517644 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 207 sec. 15.9 | |
088 | |a SuWa 207 | ||
049 | |a RLAA | ||
130 | 0 | |a Initial Study Report. |n Study plan Section 15.9, |p Air quality study. |s Draft. | |
245 | 1 | 0 | |a Air quality study, Study plan Section 15.9, Initial Study Report / |c prepared for Alaska Energy Authority ; prepared by HMMH. |
246 | 1 | 7 | |a Initial Study Report. |p Air quality study (15.9) |
250 | |a Draft. | ||
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2014] | ||
300 | |a vi, 25 p. : |b col. maps, col. chart ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 207 | |
500 | |a "February 2014." | ||
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a ARLIS assigned report number: SuWa 207. | ||
513 | |a Draft Initial Study Report. | ||
510 | 3 | |a Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term (operational) impacts. The study area includes not only the immediate Project area, but also the Railbelt region. | ||
504 | |a Includes bibliographical references (p. 13). | ||
650 | 0 | |a Air quality |z Alaska. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska. | |
650 | 0 | |a Dams |x Environmental aspects |z Alaska. | |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project. |
710 | 2 | |a Alaska Energy Authority. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Harris, Miller, Miller & Hanson Inc. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 207. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207sec15-9.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207.html |3 List of all draft Initial Study Reports. |z ARLIS Document Server |
901 | |a ARLIS |c orig 201502 | ||
596 | |a 10 | ||
098 | |a SuWa 00207 |