Air quality study, Study plan Section 15.9, Initial Study Report /

The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 15.9, Air quality study. Draft.

Initial Study Report. Air quality study (15.9)
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

Harris, Miller, Miller & Hanson Inc.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 207
Edition:Draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 207.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02708nam a2200541Ia 4500
001 2375641
003 SIRSI
005 20150216070126.0
007 ta
007 cr cn||||a||||
008 150216s2014 akubd bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)903517644 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 207 sec. 15.9 
088 |a SuWa 207 
049 |a RLAA 
130 0 |a Initial Study Report.  |n Study plan Section 15.9,  |p Air quality study.  |s Draft. 
245 1 0 |a Air quality study, Study plan Section 15.9, Initial Study Report /  |c prepared for Alaska Energy Authority ; prepared by HMMH. 
246 1 7 |a Initial Study Report.  |p Air quality study (15.9) 
250 |a Draft. 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2014] 
300 |a vi, 25 p. :  |b col. maps, col. chart ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 207 
500 |a "February 2014." 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a ARLIS assigned report number: SuWa 207. 
513 |a Draft Initial Study Report. 
510 3 |a Listed in February 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Draft Initial Study Report. 
530 |a Available also in electronic format on the Internet. 
520 |a The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term (operational) impacts. The study area includes not only the immediate Project area, but also the Railbelt region. 
504 |a Includes bibliographical references (p. 13). 
650 0 |a Air quality  |z Alaska. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska. 
650 0 |a Dams  |x Environmental aspects  |z Alaska. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Harris, Miller, Miller & Hanson Inc. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 207. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207sec15-9.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/ISRd/SuWa207.html  |3 List of all draft Initial Study Reports.  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201502 
596 |a 10 
098 |a SuWa 00207