Baseline water quality study, Study plan Section 5.5, Initial Study Report /

A baseline water quality study was started in 2012 and continued through the winter 2013/2014 winter season to document historical water quality in order to assess the effects of the proposed Susitna-Watana Hydroelectric Project on water quality in the Susitna River basin. The study area includes th...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 5.5, Baseline water quality study. Draft.

Initial Study Report. Baseline water quality study 5.5
Corporate Contributor(s):URS Corporation.

Tetra Tech, Inc.

Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 207
Edition:Draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 207.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:A baseline water quality study was started in 2012 and continued through the winter 2013/2014 winter season to document historical water quality in order to assess the effects of the proposed Susitna-Watana Hydroelectric Project on water quality in the Susitna River basin. The study area includes the Susitna River starting at river mile 19.9 (for water temperature monitoring) and 29.9 (for other water quality monitoring) to river mile 235.2 (Oshetna River) and selected tributaries within the proposed transmission lines and access corridors. Data collected in the 1970s and 1980s were evaluated in this study. Meteorological data were collected at various stations. The study included surface water physical, chemical, and bacterial conditions; metals concentrations in sediment and fish tissues; and a pilot Thermal Infrared Remote (TIR) sensing effort to obtain data to map the groundwater discharge and possible extent of thermal refugia. This study is to be completed in 2014, and the data will be used in the Water Quality Modeling Study to predict Project effects under alternative Project operations.
Physical Description:363 pages in various pagings : color illustrations, color maps, color charts ; 28 cm.
Notes:"February 2014."

"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

ARLIS assigned report number: SuWa 207.
Report Type:Draft Initial Study Report.
Bibliography:Includes bibliographical references (main volume: page 33).