Amendment No. 2 for logistic support and other services to be provided by Cook Inlet Region, Incorporated/Holmes & Narver Incorporated, in connection with Susitna Hydroelectric Project, engineering and technical services feasibility studies leading to license application /

This document is an amendment to a contract between Acres American Incorporated and Cook Inlet Region, Inc./Holmes & Narver, Inc. signed June 7, 1982. Acres has entered into an agreement with the Alaska Power Authority to study the feasibility of the Susitna Hydroelectric Project, and the this a...

Full description

Saved in:
Bibliographic Details
Alternate Title:Camp operations
Corporate Author: Acres American Incorporated.
Corporate Contributor(s):Cook Inlet Region, Inc.

Holmes & Narver.

KNIK/ADC Joint Venture.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 3286
Funding Numbers:Subcontract with KNIK/ADC Joint Venture:
Series:Document (Susitna Hydroelectric Project) ; no. 3286.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03077nam a2200601Ia 4500
001 2039204
003 SIRSI
005 20140603010628.0
007 ta
007 cr bn||||a||||
008 140602s1982 aku 000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)880847920 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 3286 
088 |a APA 3286 
049 |a RLAA 
110 2 |a Acres American Incorporated. 
245 1 0 |a Amendment No. 2 for logistic support and other services to be provided by Cook Inlet Region, Incorporated/Holmes & Narver Incorporated, in connection with Susitna Hydroelectric Project, engineering and technical services feasibility studies leading to license application /  |c Acres American Incorporated. 
246 1 4 |a Camp operations 
260 |a Anchorage, Alaska :  |b Acres American Incorporated,  |c [1982] 
300 |a 6, [4] leaves ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 3286 
500 |a Cover title. 
500 |a Place of publication on cover: New York, N.Y. 
500 |a "May 1982." 
500 |a Series statement from label on cover. 
500 |a Stamped on cover: Susitna File Copy File # 3.25 / 21" 
536 |a Subcontract with KNIK/ADC Joint Venture:  |c Subcontract No. 607800027AX  |f CIRI/H&N Project No. 6078.03 
536 |d Agreement No. P5700.10.51 
510 3 |a Assigned APA Document no. 3286 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a This document is an amendment to a contract between Acres American Incorporated and Cook Inlet Region, Inc./Holmes & Narver, Inc. signed June 7, 1982. Acres has entered into an agreement with the Alaska Power Authority to study the feasibility of the Susitna Hydroelectric Project, and the this amendment pertains to Acres' subcontractors. It includes a four-page subcontract called "Subcontract, Susitna Hydroelectric Project, Watana camp O/M services" between Cook Inlet Region, Incorporated/Holmes & Narver and its subcontractor KNIK/ADC Joint Venture. 
650 0 |a Logistics  |x Contracting out  |z Alaska  |z Susitna River Valley. 
650 0 |a Integrated logistic support. 
610 2 0 |a Susitna Hydroelectric Project  |x Research. 
650 0 |a Dams  |x Research  |z Alaska  |z Susitna River  |x Costs. 
650 0 |a Hydroelectric power plants  |x Research  |z Alaska  |z Susitna River  |x Costs. 
650 0 |a Contracts  |z Alaska. 
655 7 |a Contracts.  |2 lcgft 
710 2 |a Cook Inlet Region, Inc. 
710 2 |a Holmes & Narver. 
710 2 |a KNIK/ADC Joint Venture. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
740 0 2 |a Subcontract, Susitna Hydroelectric Project, Watana camp O/M services. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3286. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/32/APA3286.pdf  |z ARLIS Document Server 
901 |a 3755  |o rig 
596 |a 9 10 
098 |a APA 03286